Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - T21CM09269
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/26/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/26/2023 | Concrete Installation Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Concrete cylinder design strength test Failed on specimen 133464 (56 day strength at 74%). Adjacent to this Batch is cylinder specimen 133784 only achieved 101% at 56 days. Have the project engineer in charge (Jesus L. Florez) review and provide solution to this issue. | ||
| 06/26/2023 | Special Inspection Certificate Review (Deferred Submittal) Express | REQUIRES RESUBMIT | Special Inspection Form was not submitted with these 4 reports. Please submit. | ||
| 06/26/2023 | Other Inspection Reports (Deferred Submittal) Express | REVIEW COMPLETED | 1. Vertical & Horizontal reinforcing at Column Footing, CMU Columns & Concrete Slab. 2. Epoxy for Allthread Rods for Holddowns. 3. Soil Boring Test Result and Moisture-Density compaction test result. |