Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - T21CM08393
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/14/2023 | Water Sterilization Report (Deferred Submittal) | APPROVED | |||
03/14/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
03/14/2023 | Air Balancing/Commissioning Report (Deferred Submittal) | REQUIRES RESUBMIT | 1. The balance report shows that RTU-2, which serves the kitchen and BOH, is not within 10% of design air flow. Although the unit is drawing in sufficient outside air, many of the air outlets do not supply sufficient air flow to much of the area served. Increase the air flow rate for RTU-2 to within 10% of the design air flow rate and rebalance the system. Reference: Section 403.3.1.3, IMC 2018. 2. The balancing technician noted air leakage of the grease duct for KH-1 at the fan connection. Seal the fan connections per Section 506.3.2.3, IMC 2018. |
||
03/14/2023 | Special Inspection Certificate Review (Deferred Submittal) | REVIEW COMPLETED |