Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - T21CM06229
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/20/2024 | Air Balancing/Commissioning Report (Deferred Submittal) Express | APPROVED | |||
| 02/20/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/20/2024 | Concrete Installation Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. 1. Concrete field report was not submitted. (Note: you submitted the testing for hoods and exhaust fans) 2. Please resubmit. | ||
| 02/20/2024 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | COMPACTION Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. 1. Compaction field report was not submitted. (Note: you submitted the testing for hoods and exhaust fans) 2. Please resubmit. |
||
| 02/20/2024 | Post-Installed Anchor Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. 1. Epoxy Post Installed Anchor field report was not submitted. (Note: you submitted the testing for hoods and exhaust fans) 2. Please resubmit. |
||
| 02/20/2024 | Other Inspection Reports (Deferred Submittal) Express | REVIEW COMPLETED | REBAR | ||
| 02/15/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |