Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T21CM06105
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/27/2022 | Fire New Construction | APPROVED | |||
10/27/2022 | Site Engineering | APPROVED | |||
01/03/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
10/27/2022 | Commercial Plumbing | REQUIRES RESUBMIT | Provide the civil drawings noted on sheets P1.1 and P2.1 showing the origin (i.e. the water meter), route, size, and material of the water service to the toilet building. A development plan is not to be used for construction or modification of on-site utilities (e.g. water service to buildings, building sewers, site lighting, electrical service to buildings, etc.). | ||
01/03/2023 | External Reviewers - Stantec | REQUIRES RESUBMIT | The site plan on Sheet A1.0 has a note stipulating that the sewer force main will be under a separate permit, yet at the back of this set are copies of Sheet C9.0 and C9.1 of the Development Plan which provide the design of the sewer forced main. Will Sheets C9.0 and C9.1 be submitted to the building department for a separate plumbing permit? {An approved development plan does not constitute a building permit to build private utilities.} If these sheets will be submitted for a separate plumbing permit, then please remove them from this set and the index of drawings, or... If the sewer forced main is to be a part of this permit, then change the note on the site plan on Sheet A1.0 accordingly. |
||
10/27/2022 | Site Zoning | REQUIRES RESUBMIT | UNTIL THE REVISION TO DP20-0115 HAS BEEN APPROVED AND RE-ISSUED ZONING CANNOT APPROVE THE BUILDING PLAN |