Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - T20CM09121
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/05/2023 | Commercial Plumbing | APPROVED | |||
12/05/2023 | Commercial Structural | APPROVED | |||
12/01/2023 | Site Zoning | APPROVED | |||
12/12/2023 | Site Engineering | NOT REQUIRED | |||
12/12/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
12/11/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1. There are already 2 electrical services attached in different locations on the same building. Adding a 3rd service will only be allowed by Special Permission in compliance with NEC art 230.2(A), (B), (C), (D), and (E). Please justify installing a 3rd electrical service in lieu of upgrading an existing service. 2. Multiple services attached on the same building are required to have a common grounding electrode system per NEC art 250.58. 3. Verify GFI protection is provided for receptacles located within 3’ of the sinks in the LAB area. Ref; 2018 IBC section 107.2.1, 2017 NEC. |
||
12/05/2023 | Commercial Mechanical | REQUIRES RESUBMIT | Relocate the termination of the existing exhaust fan (Keynote 2) to a point 10-feet from the existing evaporative cooler (Keynote 3). Reference: Section 501.3.1 (3), IMC 2018. | ||
12/11/2023 | Fire New Construction | REVIEW COMPLETED | |||
11/30/2023 | PDSD Application Completeness | REVIEW COMPLETED |