Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.1
Permit Number - T20CM05944
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/16/2022 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
12/16/2022 | Fire New Construction | PENDING ASSIGNMENT | |||
12/16/2022 | Light Residential Building Review (OIP) | PENDING ASSIGNMENT | |||
12/16/2022 | Residential Building | PENDING ASSIGNMENT | |||
12/16/2022 | Site Engineering | PENDING ASSIGNMENT | |||
12/16/2022 | Site Landscape | PENDING ASSIGNMENT | |||
12/16/2022 | Site Zoning | PENDING ASSIGNMENT | |||
12/16/2022 | PDSD Application Completeness | REQUIRES RESUBMIT | We are in receipt of your RESUBMITTAL; however, it does not meet our requirements. ยท Your submittal did not contain a Comment Response Letter Comment response letter (resubmittal): Is a letter in response to the reviewer comments that outlines how and where the changes have been made. A response to comments should include the entire plan set, not just the sheets that have changed. Providing a comment response detailing where and how comments are addressed ensure a more timely review by COT staff. We are no longer able to accept resubmittals and revisions that do not meet our requirements. A full set of plans are required with each resubmission, along with a comment response letter. |