Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.1
Permit Number - T20CM04559
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/03/2023 | Site Zoning | APPROVED | |||
| 10/10/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/10/2023 | Residential Building | REQUIRES RESUBMIT | T20CM04559 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. PROVIDE A COMPLETE PLAN SET showing all proposed alterations to the building with 2018 IRC code compliance with component sizes. The plans require sufficient detail for demonstrating an awareness of minimum building code compliance for passing all progress inspections. PLANS: 1. Provide complete structural (roof framing) plans showing compliance with the IRC or provide an Arizona structural engineer plan set showing performance compliance, R301.1. Show all proposed repairs and alterations with 2018 IRC compliance, R301.1. The undersized 4x6 wood beams require replacement with appropriately sized beams. 2. Show the door from a garage to dwelling with a 20-minute fire rating (or 1-3/8” solid core) with self-closing and self-latching provision, R302.5.1. SECTIONS - DETAILS: 1. Show a complete cross-section detail of the new exterior wall, R106.1.1. Show the minimum 12” x 12” continuous #4 rebar reinforced footing, R403.1. Show with dimensions the exterior wood siding, insulation, interior sheathing, and pressure treated sill anchored with ½” x 10” bolts. Show the wall assembly with a 6” clearance above the ground or 2” clearance above an exterior concrete surface, R317.1 item 5. OUTDOOR LIGHTING CODE 1. Show full cutoff fixtures were located within 25 feet from the property line OLC 401.3.3. If you have any questions, please contact: Ken Van Karsen PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/Departments/Planning-Development-Services |
||
| 09/26/2023 | Site Engineering | REQUIRES RESUBMIT | This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate from your contractor will be required if this project involves any reconstruction, repair, rehabilitation, structurally connected addition, or other improvement of an existing structure (including TIs and solar). Construction of separate builds/new structures does not require a cost estimate to be provided. Construction of new buildings require elevation one foot above the base flood elevation, which may require that the foundation of the building be raised as much as two feet above the existing elevation onsite. Storage buildings with no utilities may be wet floodproofed using flood vents. For all new construction buildings, two elevation certificates must be filled out by a registered land surveyor and submitted to the City, one before the foundation is poured and one after construction is completed. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Lianne Evans at lianne.evans@tucsonaz.gov or Stephen Blood at Stephen.Blood@tucsonaz.gov if you have any questions about the FUP. |
||
| 09/21/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |