Plan Review Detail
Review Status: Requires Resubmit
Review Details: LAND DIVISION/SUBDIVISION v.1
Plan Number - S22-072
Review Name: LAND DIVISION/SUBDIVISION v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
Commercial Plumbing | APPROVED | ||||
NPPO | NOT REQUIRED | block plat, existing sub | |||
OK to Submit - External Reviewer PC Addressing | NOT REQUIRED | Email from: Nicholas Jordan To: CDRC 11/01/2022 S22-072 Oracle Gateway Final Plat does not require review by Pima County Addressing. Thank you Nicholas Jordan Site Review Project Manager - Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
|||
CDRC Post Review | PENDING ASSIGNMENT | ||||
Commercial Building | REQUIRES RESUBMIT | Provide details showing that buildings meet 2018 IBC requirements for separation of buildings or existing 2-hour fire wall where parcels and buildings intersect. Juan Garcia juan.garcia@tucsonaz.gov |
|||
Commercial Structural | REQUIRES RESUBMIT | Provide details showing that buildings meet 2018 IBC requirements for separation of buildings or existing 2-hour fire wall where parcels and buildings intersect. Juan Garcia juan.garcia@tucsonaz.gov |
|||
External Reviewers - Pima County Wastewater (RWRD) | REQUIRES RESUBMIT | A review is required and needed by RWRD, however will enter a "requires resubmit", so that that permit can move forward. | |||
New Services/JOC | REQUIRES RESUBMIT | 1. The proposed final plat does not show existing 15’ public water easement created by DKT. 7807, PG. 1194 properly. It shows a “leg” of this existing easement running north in the northern portion of Lot 7 and then turning west and straddling the common lot line between Lot 1 and Lot 2, that isn’t shown on Tucson Water’s Plan No. 085-1986. Nor is it present in the legal description of the recorded easement. Please revise the proposed final plat as necessary to show existing 15’ public water easement created by DKT. 7807, PG. 1194 properly. 2. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |
|||
Site Engineering | REQUIRES RESUBMIT | 1. The reference in the title block for this final plat needs to be corrected. It reads subdivision of unsubdivided land, but this is a resubdivision of already subdivided land. Revise as needed. 2. Provide as separate document or on the plat revised and new cross access agreements within the new subdivision. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
|||
Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Oracle Gateway Lots 1 through 7 FINAL PLAT (1st Review) S22-072 TRANSMITTAL DATE: November 14, 2022 DUE DATE: December 07, 2022 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2-07.1.0 APPLICABILITY Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.” A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site. 2-07.5.0 CONTENT REQUIREMENTS 2-07.5.1 General COMMENT: 2-07.5.1.H - The subdivision case number, S22-072, assigned to this plat must be placed in the lower right corner of the plat next to the title block on all sheets. COMMENT: Some type of cross access, cross parking agreement/easement is required for this project. Provide a copy of the recorded documents with the next submittal. If you have any questions about this transmittal, please contact Nicholas Ross at Nocholas.Ross@tucsonaz.gov. |
|||
CDRC Review Coordinator | REVIEW COMPLETED | ||||
Fire New Construction | REVIEW COMPLETED | ||||
OK to Submit - Engineering | REVIEW COMPLETED | ||||
OK to Submit - Zoning | REVIEW COMPLETED |