Plan Number: S22-061
Parcel: 14044248A

Address:
6131 E BENSON HY

Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.2

Plan Number - S22-061
Review Name: LAND DIVISION/SUBDIVISION v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
External Reviewers - Pima County Addressing APPROVED [EXTERNAL] Approval S22-061

Nicholas Jordan
CDRC
Leon, Chris <Chris.Leon@kimley-horn.com>
Good afternoon,

Pima County Addressing approves S22-061.

Thank you
Nicholas Jordan
Site Review Project Manager – Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-9623
Site Zoning APPROVED
CDRC Post Review Express PENDING ASSIGNMENT
External Reviewers - Pima County Assessor REQUIRES RESUBMIT Office of the Pima County Assessor
240 N. Stone Ave.
Tucson, Arizona 85701
SUZANNE DROUBIE
PIMA COUNTY ASSESSOR
TO: City of Tucson Development Services
FROM: Karl Christensen
GIS Analyst
Pima County Assessor’s Office
Karl.Christensen@pima.gov
(520)724-3125

DATE: July 26, 2023

RE: Assessor’s Review and Comments Regarding: (SUBMITTAL 2)
S22-061 – FINAL PLAT – Arroyo at Los Reales, Lots 1-6

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
_ Plat meets Assessor’s Office requirements.
__X___ Plat does not meet Assessor’s Office requirements.
COMMENTS:
• As this plat will be the document that describes the creation of a new
public street, it is important that it includes line-segment dimensions
(distance & bearing) for the centerline, as well as R/W offsets from the
centerline. Please also show these centerline dimensions as they tie
into existing adjacent streets, such as Los Reales Rd. and Wilmot Rd.
• Please note that due to the design of the North side of the new Rincon
Ridge Dr. R/W to the East of this subdivision, it appears as though
either a small sliver of the southern boundary of Lot 1 of SQ20180160393
(Current APN: 140-44-2470, Ownership: Ann M. Smith TR) will be taken for
R/W, or a longer sliver of Lot 2 of SQ20180160393 between said Lot 1 and
the new R/W will be left as residue. If the former is true, ownership
will need to be addressed. If the latter is true, please confirm this
intention. If neither is true and the intent is for the North R/W of the
new Rincon Ridge Dr. to be coincident with the southern boundary of said
Lot 1, changes will need to be made to this plat to design the new R/W
to begin its curve (curve C13) at the Found 1/2” rebar property corner
for the Southwest corner of said Lot 1.
NOTE: While small allowances for new survey dimension/bearings differing
from previously surveyed/platted dimension/bearings are typically given
due to obvious intent/measurement-variance, in this case a curve
(however small) is seemingly being introduced to an otherwise straight
line between property corners. This should be addressed at this juncture
to avoid potential issues after recordation.
• Please also note that the Basis of Bearing given in the General Notes
does not match the Basis of Bearing given on Sheet 3.
NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO
DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE
OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN
AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA
PREVIOUSLY SUBMITTED.
New Services/JOC REQUIRES RESUBMIT S22-061 - Land Division_Subdivison v2 – 6131 E BENSON HY

1. Submit a copy of the proposed final plat, a copy of the water easement granted by DKT 13665, PG 2791, and a request to release this water easement to Ms. Kathryn Gerber, Engineering Manager of Tucson Water’s Planning Section for review and approval. Ms. Gerber may be reached by sending an email to kathryn.gerber@tucsonaz.gov.

2. Include Ms. Gerber’s response with the next submittal of this final plat.

3. Show the half and the full right of way width of S. Rincon Ridge Drive on the final plat.

4. The language in the Dedication does not convey S. Rincon Ridge Drive to the public. Please revise the Dedication using the standard paragraphs in Tucson’s Unified Development Code Administrative Manual Section 2-07.5.3.B.

5. The final plat does not show the water easements proposed on the water master plan for this subdivision. Please explain why in your comment response letter that you will submit with your next submittal of this final plat.

6. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
Site Engineering REQUIRES RESUBMIT 1. See previous comment 3 - There are still a few easements showing on the title report that are not shown on the plat. In the Title Report under schedule B, Part II Exceptions: numbers 15, 16, 18, and 23 on pages 9 and 10 need be shown on the plat. Revise as needed.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
CDRC Application Completeness Express REVIEW COMPLETED
External Reviewers - Pima County Wastewater (RWRD) REVIEW COMPLETED The applicant is responsible for obtaining review and approval by Pima County for projects involving RWRD sewers, on-site wastewater treatment facilities and public water systems. The applicant must provide an Approval letter from RWRD prior to PDSD finalizing your permit. A condition will be added to the permit and will not be removed until this request has been satisfied.
External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED [EXTERNAL] Arroyo at Los Reales, Final Pl / S22-061

TEP-DEVREV <TEPDEVREV@tep.com>
CDRC
Greetings,

Tucson Electric Power Co. (TEP) has reviewed and has no objection to the plat for Arroyo at Los Reales, submitted on July 17th, 2023.

Please call the New Construction Department at 520-918-8300 to apply for service for new development. Submit a final set of approved plans, including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required for new TEP facilities, they will be obtained by separate conveyance.

Respectfully,
Tucson Electric Power Co.
Land Resources Department