Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S22-057
Parcel: 13613020A

Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.2

Plan Number - S22-057
Review Name: LAND DIVISION/SUBDIVISION v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
CDRC Post Review Express PENDING ASSIGNMENT
External Reviewers - Pima County Assessor REQUIRES RESUBMIT Office of the Pima County Assessor
240 N. Stone Ave. Tucson, Arizona 85701
SUZANNE DROUBIE PIMA COUNTY ASSESSOR

TO: City of Tucson Development Services
FROM: Karl Christensen
GIS Cartographer
Pima County Assessor’s Office
(520)724-3125

DATE: February 23, 2023 RE: Assessor’s Review and Comments Regarding: (SUBMITTAL 2) S22-057 – MINOR LAND DIVISION, MINOR SUB – FINAL PLAT

__X___ Plat does not meet Assessor’s Office requirements.

See attachment.
New Services/JOC REQUIRES RESUBMIT 1. The 25’ wide strip of right of way dedicated to the City of Tucson by this plat doesn’t need to be and shouldn’t be dedicated as a 25’ wide public water line easement. This 25’ wide strip of right of way also may not be dedicated (i.e. reserved) as a 25’ wide private drainage easement for the benefit of just Lots 1-3. Remove the label for such easements from the plat.
2. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
Site Engineering REQUIRES RESUBMIT 1. Please include in the next submittal a copy of the title report.
2. Please show and provide the pins for the new property corners.

Lianne Evans
lianne.evans@tucsonaz.gov
520-837-5341
Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: 8750 E Golf Links Road
FINAL PLAT (1st Review)
S22-057

TRANSMITTAL DATE: February 23, 2023

DUE DATE: March 01, 2023

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.
2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.
2-07.5.0 CONTENT REQUIREMENTS
1. COMMENT: 2-07.5.1.E.1 – Provide a subdivision name within the title block.

2. COMMENT: 2-07.5.1.H – Provide the subdivision case number, S22-057, in the lower right corner of the plat next to the title block on all sheets.
If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov.
\
External Reviewers - Pima County Wastewater (RWRD) REVIEW COMPLETED The applicant is responsible for obtaining review and approval by Pima County for projects involving RWRD sewers, on-site wastewater treatment facilities and public water systems. This Approval is a required condition that must be satisfied prior to finalizing the permit.