Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: LAND DIVISION/SUBDIVISION v.1
Plan Number - S22-054
Review Name: LAND DIVISION/SUBDIVISION v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
External Reviewers - Pima County Assessor | APPROVED | TO: City of Tucson Development Services FROM: Suzanne Gilpin, GIS Cartographer Pima County Assessor’s Office, (520)724-4387 DATE: September 12, 2022 RE: Assessor’s Review and Comments Regarding Final Plat- S22-054 – SHINER ARMORY PARK 1ST SUBMITTAL X Plat meets Assessor’s Office requirements. |
|||
Site Engineering | APPROVED | ||||
External Reviewers - Pima County Addressing | NOT REQUIRED | Email from: Nicholas Jordan To: CDRC 11/02/2022 Please remove Pima County Addressing from the review queue for S22-054 Final Plat for Shiner Armory Park. We will issue addresses after the plat records. Nicholas Jordan Site Review Project Manager - Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 |
|||
CDRC Post Review | PENDING ASSIGNMENT | ||||
External Reviewers - Pima County Wastewater (RWRD) | REQUIRES RESUBMIT | To: Applicant From: Planning & Development Services Dept. Contact Pima County Wastewater by email: Sewer@Pima.gov, or phone 520-724-6500 to request their approval. Submit the approval letter to the City of Tucson with your next submittal. It is required before the final step of Mayor and Council's approval of the FINAL PLAT. |
|||
External Reviewers - Tucson Airport Authority | REQUIRES RESUBMIT | See separate document for comments from TAA | |||
External Reviewers - Tucson Electric Power (TEP) | REQUIRES RESUBMIT | email from: TEP-DEVREV <TEPDEVREV@tep.com> Sent: Wednesday, September 21, 2022 8:20 AM To: CDRC <CDRC@tucsonaz.gov> Subject: S22-054 TEP has reviewed plans received on September 12th, 2022, the plat for the Shiner Armory Park, Lots 1 through 6 subdivision. Please note that TEP is awaiting customer approval of the Preliminary Construction Design. Customer approval and a copy of the Approved Tentative Plat are required for TEP to prepare a final Construction Drawing. If revisions to the preliminary design are needed, easements are required for TEP facilities if not appropriately recorded on the final subdivision plat. They will need to be obtained by a separate instrument. Costs for removing or relocating existing TEP facilities will be billable to the developer. The customer is responsible for compliance with City Ordinances. Please note a jurisdictional permit for any work on a public road right of way where applicable. Tucson Electric Power Co. Land Resources Department |
|||
New Services/JOC | REQUIRES RESUBMIT | To: Applicant From: Planning & Development Services Dept. Contact Tucson Water to request a Water Availability letter. Include the Letter in your next submittal. This is required before the final step of Mayor and Council's approval of the FINAL PLAT. |
|||
Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Shiner Armory Park Lots 1 - 6 FINAL PLAT (1st Review) S22-054 TRANSMITTAL DATE: September 20, 2022 DUE DATE: October 03, 2022 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2-07.1.0 APPLICABILITY Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.” A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site. 2-07.5.0 CONTENT REQUIREMENTS 1. COMMENT: 2-07.5.1.H – Provide the subdivision case number, S22-054, and the development package case number, DP22-0226, in the lower right corner of the plat next to the title block on all sheets. 2. COMMENT: Until DP22-0226 is approved Zoning cannot approve this final plat. If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp |
|||
CDRC Application Completeness | REVIEW COMPLETED | ||||
External Reviewers - Southwest Gas | REVIEW COMPLETED |