Plan Number: S22-051
Parcel: 11449030A

Review Status: Requires Resubmit

Review Details: LAND DIVISION/LOT SPLIT v.1

Plan Number - S22-051
Review Name: LAND DIVISION/LOT SPLIT v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
CDRC Post Review Express PENDING ASSIGNMENT
Commercial Plumbing REQUIRES RESUBMIT 1. How will the new parcel be supplied with water? For the purposes of having a water meter, a parcel is required to have a minimum width of 15-feet of frontage on a water main. An easement is not considered to be frontage. Reference: Tucson Water Remote Meter Policy, Number IV-B.08, dated 07/14/2009.
2. How will the new parcel be provided with a septic system?
Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL



FROM: PDSD Zoning Review



PROJECT: 8445 E Tanque Verde Rd – SR

S22-051

Land Split (1st Review)



TRANSMITTAL DATE: November 21, 2022



SECTION 2-08.0.0:  LAND SPLIT



2-08.5.0   CONTENT REQUIREMENTS



COMMENT: 2-08.5.F – Provide perimeter yard setback dimensions from all existing structures to the proposed property lines. Per UDC Table 6.3-1 the required perimeter yard setback is based on Nonres Use to Res Zone and is 4 time the height of the exterior wall as measured from design grade to the highest point of the wall.



COMMENT: 2-08.5.H – COMMENT: 2-08.3.4 – Legal access must be provided to the propose parcel. Depending on how this access is provided some type of easement may be required.



COMMENT: The proposed Parcel A does not meet the minimum lot size of 144,000 SF as required by UDC Table 6.3-1. A Board of Adjustment for Variance or Rezoning will be required.



COMMENT: Provide a lot coverage calculation that meets the requirements of UDC Article 6.4.3. for the remaining parcel with the existing structures minus the proposed parcel. Maximum lot coverage is 50%.



If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.
TW New Development Review REQUIRES RESUBMIT 1. The existing public water easement on the property was not shown on the Record of Survey. Therefore it is not possible to determine either of the following:
a. If Parcel A has a minimum of 15’ of real property frontage on the public water easement that is necessary to comply with Tucson Water’s Remote Meter Policy.
b. If the southernmost lot line of Parcel A splits this public water easement, which would be unacceptable.
2. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov