Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.2

Plan Number - S22-042
Review Name: LAND DIVISION/SUBDIVISION v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
External Reviewers - Tucson Electric Power (TEP) APPROVED Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted September 12th, 2022. There are existing facilities within the
development. There do not appear to be conflicts at this time; however, Plans do not
show the existing TEP poles, underground primary cable, secondary cable or pedestal. Secondary pedestal appears to be in property. Please review the location of the cable and equipment on marked up plans & TEP map attached. For relocation, or for new service, please contact Design Services at 520-918-8300. Any relocation requests will be billable to the customer.
In order to apply for electric service, call the New Construction department at (520) 918- 8300. Submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans, if available include a PDF version of the plans.
If easements are required, they will be secured by separate instrument. Your final
plans should be sent to:
Amanda Whitney
Tucson Electric Power Company
New Business Residential Project Manager
P. O. Box 711 (OH 204)
Tucson, AZ 85702
(520) 526-4350
Should you have any technical questions, please contact the area Martin Salazar at
(520) 305-6713.
Sincerely,
Conor Mahoney
Office Support Assistant
Design/Build
Site Engineering APPROVED Replace "Block" in both the title at the top of the plat, and in the title block with "Final". Ensure it states FINAL PLAT FOR SOUTH PARK VILLAS RESUB #1 LOTS 1-3

Joshua Garcia
joshua.garcia@tucsonaz.gov
Site Zoning APPROVED
CDRC Post Review Express PENDING ASSIGNMENT
Final Plat Package Fast PENDING ASSIGNMENT
CDRC Post Review Express REQUIRES RESUBMIT May 15, 2023
Grenier Engineering, Inc.
Attn: John Grenier
6300 E. El Dorado Plaza Suite A120
Tucson, AZ 85715
Subject: Final Plat for (S22-042) South Park Villas Resub #1
The above referenced project has been conditionally-approved by the City Development Review Committee (CDRC) to prepare for Mayor & Council approval. Please submit six (6) weeks in advance to the next available Mayor & Council meeting, July 18, 2023. Please take the following actions and upload PDF scans of items listed. Once Zoning approves folder in 'Final Plat Package' workflow (5-10 day review), then hand deliver items to 1st floor of PDSD for us to obtain City staff's signatures:
1. Address Site Engineering review comments along with comment response letter.
2. Original set of executed and notarized (permanent, black ink only) Final Plat on double matte océ or photo mylar. Fill in blank for 'filed at the request of ____'. Leave Date and Time blank.
3. Title report current within the last thirty (30) days or statement from Title Company certifying the title report previously submitted is still valid.
4. Check or money order made payable to “Pima County Recorder” in the amount of: $24.00, $24.00 for the first plat sheet and $20.00 for each additional plat sheet (in other words: $20 per plat sheet plus a flat $4.00 handling fee), along with flat $30.00 fee per document for Consent to Dedicate and CC&R (if applicable). The City pays to record the Assurance Agreement. If you are unsure of the fees, please call the County Recorder’s Office at 520-740-4350. Check must be pre-printed with name and address and dated within 60 days of the scheduled Mayor & Council meeting.
5. Original set of executed and notarized CC&R (if applicable).
6. Original set of executed and notarized Assurance Agreement (if applicable). For Third Party Land Trust, provide original Agreement to Construct, original Amendment to Trust, and copy of Trust Agreement.
7. Property owner(s) and consultant mailing addresses to receive notification from the City Clerk’s Office one (1) week prior to and following Mayor & Council meeting.
The Final Plat, CC&R, and Assurance Agreement must be approved at the same Mayor & Council meeting. The City Development Review Committee ensures the Assurance Agreement is reviewed by the City Attorney’s Office prior to the Mayor & Council meeting. The recorded CC&R will be mailed to the address on the cover sheet. The City Clerk’s Office keeps the recorded Final Plat and Assurance Agreement. A copy of the recorded Final Plat and Assurance Agreement will be available on www.tucsonaz.gov/pro.
Should you have questions, contact Joshua Garcia at 520-837-5339 or Joshua.garcia@tucsonaz.gov.
xc: S22-042
External Reviewers - Pima County Wastewater (RWRD) REVIEW COMPLETED Pima County Wastewater approval & sewer easement recordation included with revised files. Satisfy resubmit comments from 10/28/2022.
New Services/JOC REVIEW COMPLETED Water Availability letter included with resubmittal. Satisfies Resubmit comments from 10/28/2022