Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: LAND DIVISION/SUBDIVISION v.3
Plan Number - S22-004
Review Name: LAND DIVISION/SUBDIVISION v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| CDRC Post Review Express | PENDING ASSIGNMENT | ||||
| External Reviewers - Pima County Assessor | REQUIRES RESUBMIT | SUZANNE DROUBIE PIMA COUNTY ASSESSOR TO: City of Tucson Development Services FROM: Karl Christensen GIS Analyst II Pima County Assessor’s Office Karl.Christensen@pima.gov (520)724-3125 DATE: May 12, 2025 RE: Assessor’s Review and Comments Regarding: (SUBMITTAL 3) S22-004 – BECKETT SUBDIVISION - FINAL PLAT * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Plat meets Assessor’s Office requirements. __X___ Plat does not meet Assessor’s Office requirements. COMMENTS: • Please review the subdivision tie line. The distance currently is shown twice, with one of the distances missing a decimal point. See the R.O.S. you have provided for reference. • Please ensure that the new Lot lines showing the boundaries of Lots in this resubdivision are solid and the heaviest lineweight. Lines for items such as parent Lots/parcels, Right-of-Ways, etc. should be the lightest lineweight and be dashed or dot-dashed. Note: The parent subdivision Lot 1 / Lot 2 line, while dashed, shares the same lineweight as the new Lot lines of this resubdivision. This could cause confusion for other users of this plat. See the R.O.S. you have provided for reference. • Currently this plat shows the new Lots of this resubdivision as set back from the Belvedere Avenue Right-of-Way. Please review the placement of centerline and Right-of-Way linework for adjacent streets (ie: Belvedere Avenue) in relation to this subdivision to ensure accuracy. See the R.O.S. you have provided for reference. • It is presumed that the 60.00’ annotation at the top-right of the subdivision appears to have come with the copy/paste of the bearing annotation below it. If this was the case, please remove the top-right 60.00’ annotation, as it would be incorrect. See the R.O.S. you have provided for reference. • Reviewing the dimensions in the plat against the R.O.S. you have provided appears to show that the bearing for the North line of Lot 1 of this resubdivision is inconsistent with the rest of the bearings in the plat. Please review the plat for accuracy and consistency to determine if this is a typo or intended. See the R.O.S. you have provided for reference. • The bearing annotation for the South line of Lot 2 of this resubdivision is missing an E or W to be a correctly structured bearing. Please correct this. See the R.O.S. you have provided for reference. • Please review the labeling for adjacent Lots/Parcels. The labels for Lots 1 and 2 of the parent subdivision are swapped, and the APN for the parcel this plat is subdividing appears to be labeling the parcel to the South. Please fix these issues. See the R.O.S. you have provided for reference. • The ‘Monument Ties’ inset added to the plat shows the parcel being subdivided as existing only in Lot 1 of the parent subdivision, rather than Lots 1 & 2. See the R.O.S. you have provided for reference. |
|||
| External Reviewers - Pima County Wastewater (RWRD) | REQUIRES RESUBMIT | The applicant is responsible for obtaining review and approval by Pima County, for projects involving RWRD sewers, on-site wastewater treatment facilities and public water systems https://www.pima.gov/1766/Wastewater-Reclamation. The applicant must provide an Approval letter from RWRD, prior to PDSD Approving the permit. | |||
| Site Engineering | REQUIRES RESUBMIT | See Assessor comments | |||
| Site Zoning | REQUIRES RESUBMIT | See Pima County Assessor Comments. | |||
| CDRC Application Completeness Express | REVIEW COMPLETED |