Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP22-0300
Parcel: 12507170A

Address:
500 N TUCSON BL

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - DP22-0300
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/08/2022 Fire New Construction APPROVED
11/17/2022 NPPO NOT REQUIRED Existing project, no native plants
11/21/2022 CDRC Post Review PENDING ASSIGNMENT
11/21/2022 Site Engineering REQUIRES RESUBMIT Please see zoning comments.
Provide sidewalk widths and demonstrate accessible Pedestrian Circulation Path.

Joshua Garcia
joshua.garcia@tucsonaz.gov
11/17/2022 Site Landscape REQUIRES RESUBMIT CDRC TRANSMITTAL
TO: Planning and Development Services Department, Plans Coordination
FROM: Anne Warner, RLA
PDSD Landscape/Native Plant Preservation Section

PROJECT:
ACTIVITY NO: DP22-0300
Address: 50 N Tucson Blvd
Zoning:
Existing Use: Office
Proposed Use: Office

TRANSMITTAL DATE: November 17, 2022
DUE DATE: November 22, 2022
COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Landscape Review Section comments were addressed.
This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.
General Note - UDC 2-10.4.1 Identification and Descriptive Data - All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.
1. The Unified Development Code (UDC) requires all new development or an expansion of an existing development submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4. and Administrative Manual 2-10.
2. Expansion calculations must be included on plans to determine if additional landscape is required.
3. Show existing trees on site and their disposition.
4. Please label the existing and future rights of way for all public streets, UDC 7.6.4.C.2.a.
5. Consider using an organic groundcover such as mulch instead of d.g.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package

YOUR NEXT STEPS: Submit documents to the Filedrop
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
Select "Existing Application"
1) Comment Response Letter (your response to
the reviewer's Requires changes comments)
2) Plan Set (or individual sheets)
3) Any other items requested by review staff

If you have any questions, please contact me at anne.warner@tucsonaz.gov
11/08/2022 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL



FROM: PDSD Zoning Review



PROJECT: Sam Hughes Village

Development Package (1st Review)

DP22-0300



TRANSMITTAL DATE: November 08, 2022



DUE DATE: November 21, 2022



COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.



This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).



Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is October 09, 2023.



2-06.3.0 FORMAT REQUIREMENTS



COMMENT: 2-06.3.2 – All mapped data shall be drawn at an engineering scale having no more than 50 feet to the inch.



CONTENT REQUIREMENTS



COMMENT: 2-06.4.2.D - Provide the page number and the total number of pages in the package (i.e., sheet xx of xx) within the title block.



COMMENT: 2-06.4.3 – Provide the development package case number, DP22-0300, adjacent to the title block on all sheets.



COMMENT: 2-06.4.4 - The project-location map shall cover approximately one square mile,



COMMENT: 2-06.4.4.C - Provide the section, township, and range and label the section corners for the location map.



2-06.4.7 - General Notes

The following general notes are required. Additional notes specific to each plan are required where applicable.



2-06.4.7.A - Zoning and Land Use Notes



COMMENT: 2-06.4.7.A.1 - List as a general note: "Existing zoning is C-1, P & R-2"



COMMENT: 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.



2-06.4.7.A.8 - For development package documents provide:



COMMENT: 2-06.4.7.A.8.d - As this site is part of a larger site, see DP17-0262, all calculations encompass the entire site, whether existing or proposed. For calculation this plan should include all addresses shown on DP17-0262



2-06.4.9 - Information on Proposed Development

The following information on the proposed project shall be shown on the drawing or added as notes.



COMMENT: 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. The provided zoning keymap is not correct.



COMMENT: 2-06.4.9.H.5 – Fully dimension the required back-up spurs that shall be located at the south end of the PAALs where the work is proposed, see UDC Article 7.4.6.F.4



COMMENT: 2-06.4.9.H.5.a - Provide an updated vehicle parking calculation that clearly demonstrates that the site still meets the requirements of a shopping center, reference DP17-0262.

ENT: 2-06.4.9.L -



COMMENT: 2-06.4.9.R - Provide sidewalk widths for all proposed sidewalks.



COMMENT: 2-06.4.9.R – Clearly demonstrate how the requirements of TSM Sections 7-01.4.2 & .3 are met.



COMMENT: 2-06.4.9.R - Cleary demonstrate how someone requiring accessible access will gain access to the proposed sidewalks, i.e. ramps.



If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov.



RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
11/04/2022 CDRC Review Coordinator REVIEW COMPLETED
11/07/2022 Historic REVIEW COMPLETED No historic review needed. Property not in an HPZ/HL.
10/28/2022 OK to Submit - Engineering REVIEW COMPLETED
11/01/2022 OK to Submit - Zoning REVIEW COMPLETED