Permit Number: DP22-0290
Parcel: 11508090A

Address:
1150 N 7TH AV

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.3

Permit Number - DP22-0290
Review Name: DEVELOPMENT PACKAGE REVIEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2023 Site Landscape APPROVED
01/19/2023 Historic NOT REQUIRED The ASARCO Building is listed individually on the National Register. The parking lot is considered a contributing element to the listing. The property is not listed locally, so no city of Tucson Historic review is required. It is recommended that the project is reviewed by the State Historic Preservation Officer (SHPO) to ensure compliance with the Federal Tax Credit program.
01/26/2023 CDRC Post Review PENDING ASSIGNMENT
01/26/2023 Site Engineering REQUIRES RESUBMIT 1. See Zoning comment regarding PDP, a letter from zoning confirming allowed deviations from PDP is required before engineering can approve

Scott Haseman
scott.haseman@tucsonaz.gov
01/09/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: 7th Avenue Lofts
Development Package (2nd Review)
DP22-0290

TRANSMITTAL DATE: January 9, 2023

DUE DATE: January 9, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is October 17, 2023.

CONTENT REQUIREMENTS

1. This comment was not fully addressed. The reference to DP21-0107 is still on sheets 7 – 15. SCOMMENT: 2-06.4.3 –Remove the reference to DP21-0107 from the plan as the DP has been withdrawn.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. This comment was not addressed. COMMENT: 2-06.4.7.A.3 - The rezoning conditions listed on sheet 2 do not match the recommended conditions submitted with this DP.

3. This comment was not addressed. COMMENT: 2-06.4.7.A.3 - The submitted PDP and this plan do not match. Provide written documentation from the Rezoning Section that states a revision to PDP will not be required.


2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

4. This comment was not addressed, provide the required 2’-6”dimension on the detail. COMMENT: 2-06.4.9.H.5.d - As the proposed short-term bicycle parking located near the southwest corner of Building A is located adjacent to require hand rails demonstrate on the plan or detail that the requirements of UDC Article 7.4.9.B.2.g are met.


If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
01/11/2023 Fire New Construction REVIEW COMPLETED
01/06/2023 Traffic Engineering Review REVIEW COMPLETED No Comments