Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.2
Permit Number - DP22-0284
Review Name: DEVELOPMENT PACKAGE REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/23/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
01/23/2023 | Site Engineering | REQUIRES RESUBMIT | 1. Show and dimension the backup distance required for the solid waste vehicle to service the proposed trash enclosure. If greater than 80' a TSMR will be required. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
01/06/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Bridges B-III Lot 2b Development Package (1st Review) DP22-0284 TRANSMITTAL DATE: January 6, 2023 DUE DATE: January 26, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is October 12, 2023. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, DP22-0284, adjacent to the title block on all sheets. 2-06.4.7.A.8 - For development package documents provide: 2. COMMENT: 2-06.4.7.A.8.d – Provide a fully updated Bridges tracking table with the next submittal. 3. COMMENT: Provide a copy of the Design Review Committee approval letter with the next submittal, see PAD-15 Section C.6. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |