Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP22-0280
Parcel: 124040010

Address:
1448 E 1ST ST

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.3

Permit Number - DP22-0280
Review Name: DEVELOPMENT PACKAGE REVIEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/02/2023 Commercial Plumbing APPROVED
02/16/2023 Site Engineering APPROVED
01/06/2023 Site Landscape NOT REQUIRED
02/16/2023 CDRC Post Review PENDING ASSIGNMENT
01/06/2023 Site Zoning REQUIRES RESUBMIT Overall Comments:
PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Delta Gamma - Façade + Patio Development Package (2nd Review) DP22-0280 TRANSMITTAL DATE: January 6, 2023 DUE DATE: January 12, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is October 10, 2023. CONTENT REQUIREMENTS 1. As the proposed pergola does not meet perimeter yard setback requirements at a minimum a neighbor’s setback waiver is required. Per UDC Article 6.6.2.D An accessory structure that exceeds the allowable height of a wall within a perimeter yard and is detached from a principal structure shall comply with the perimeter yard width standards of the principal structure, except that the accessory structure may be built to a parcel line with the consent of the adjoining or, when separated by an alley, adjacent property owner(s). To secure this neighbor setback waiver the following statement must be provided on the plot plan and be signed and dated by the adjacent property owner(s): My Name is____________________ and I am the owner of the property located at_______________________. I have reviewed the site plan and I have no objection to structure being located or constructed________ feet from the property line as depicted on the site plan. Signature: _____________________________ Date: _________________________________ If you are unable to secure this waiver a Design Development Option will be needed. A Design Development Option (DDO) must be submitted and approved to reduce the required setback, DDO application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. If you have questions about the DDO application or process please contact Mark Castro at Mark.Castro@tucsonaz.gov. COMMENT: 2-06.4.9.O - Provide a perimeter yard setback dimension form the pergola posts to the south property line. 2. This comment was not addressed. The parking spaces are still shown on the plan. COMMENT: 2-06.4.9.R - Provide a 4’-0” sidewalk along the west side of the proposed pergola, see TSM Section 7-01.4.1.C. This sidewalk shall also meet the requirements of TSM Section 7-01.4.2 & 4.3. If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
01/11/2023 Fire New Construction REVIEW COMPLETED