Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP22-0278
Parcel: 10513096A

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - DP22-0278
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/09/2022 Commercial Plumbing APPROVED
11/14/2022 NPPO APPROVED
11/14/2022 Site Landscape APPROVED
11/14/2022 External Reviewers - Pima County Addressing NOT REQUIRED This project does not require review by Pima County Addressing. We worked with the applicant to pre-address the site. Addresses will be released when the DP is approved.
11/28/2022 CDRC Post Review Express PENDING ASSIGNMENT
10/31/2022 Site Engineering REQUIRES RESUBMIT Site will require centralized waste disposal or ES approval to use roll out bins per TSM 8-01.5.1 A.

Sidewalls of the basins must be stabilized with dumped riprap, screened rock, or hydroseeding to comply with standards outlined in Table 4.1 in the CoT Retention Detention Manual.

In the Retention section of the Drainage Report, specify how the minimum retention capacity of 577 cf is reached from Basin A's capacity of 306 cf and Basin C's capacity of 571 cf.

Please label Basin A and Basin C in the site plan and show how Basin A will drain into Basin C as specified in the Detention Analysis section of the Drainage Report.

Access lane in ADA parking needs to be designed at 1% slope and constructed with a 2% maximum slope.

Show how water will be directed to basin A: grading indicated on drainage plan is not represented on the grading plan behind the units

Show how water will be directed off roofs, as well as any scuppers/rip-rap that will be used once the water reaches the ground, as well as grading that will direct towards landscaping

Revise/clarify grading on entryway to basin C: conflicting adjacent drainage arrows will most likely result in erroneous construction that does not properly drain water

Clarify path water running off northeast parking lot: water is not allowed to cross over sidewalks, scuppers or other means of conveying water must be used

All landscaping must be depressed 6-9”, detail 3 does not agree with this

Clarify that basins will be for both retention and detention

Note 2: Sidewalk must have 6” vertical curb

Lianne Evans
lianne.evans@tucsonaz.gov
520-837-5341
11/01/2022 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T22CM08172, T22CM08173 – DP22-290
110 E Helen St, Bldg 1 – O-3
Multi-Family (1st Review)

TRANSMITTAL: October 26, 2022
COMMENT: Resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in O-3 Zone (UDC 4.7.15). Multi-Family is a permitted use (UDC Table 4.8-2).

1. Zoning has reviewed the building plans for compliance with DP22-0290 and all though it appears that the building plans match the DP in regard to building size and height, until the DP is approved by all review agencies Zoning cannot approve.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
11/28/2022 Fire New Construction REVIEW COMPLETED Buildings require fire sprinklers. That shall be noted on the drawings. Customer shall resubmit the DP with these corrections.
Questions
Jennifer Peel-Davis
Jennifer.Peel-Davis@Tucsonaz.gov
520-837-7033