Permit Number: DP22-0271
Parcel: 116277640

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.2

Permit Number - DP22-0271
Review Name: DEVELOPMENT PACKAGE REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/08/2022 Site Landscape APPROVED
11/08/2022 CDRC Post Review PENDING ASSIGNMENT
10/19/2022 Site Engineering REQUIRES RESUBMIT 1. Please provide record of Starr Pass Community approval of the grading plan.

2. The retaining wall will require a separate building (BU) permit. Please make note of this in the plans as well.

3. The floodplain delineated on the plans is incorrect. Refer to tentative plat S02-007 to see the accurate floodplain.

Lianne Evans
lianne.evans@tucsonaz.gov
520-837-5341
10/18/2022 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Parades Residence – Grading Only
Development Package (1st Review)
DP22-0271

TRANSMITTAL DATE: October 18, 2022

DUE DATE: October 19, 2022

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is September 27, 2023.

2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS

1. COMMENT: 2-06.2.4 – The development package is designed to allow for concurrent review of any site related reviews. Remove sheets A-1, A-2, A-7 & A-8 from the grading plan set.

2-06.3.0 FORMAT REQUIREMENTS

2. COMMENT: 2-06.3.12 – The drawing index should reflect the drawings submitted. Once comment 1 is addressed provide a drawing index that matches what is submitted.

CONTENT REQUIREMENTS

3. COMMENT: 2-06.4.2.D - The page number and the total number of pages in the package (i.e., sheet xx of xx) shall match what is submitted, see comment #1.

4. COMMENT: 2-06.4.3 – Provide the development package case number, DP22-0080, adjacent to the title block on all sheets.

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

5. COMMENT: 2-06.4.8.B – There is a 20’ drainage easement called out under Keynote 7 that the building is encroaching into. Relocate the building so that it does not encroach into this ieasement.


If you have any questions about this transmittal, please contact Nicholas Ross at Nocholas.Ross@tucsonaz.gov.

To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package