Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP22-0245
Parcel: 14103028A

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - DP22-0245
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/14/2022 External Reviewers - Pima County Addressing NOT REQUIRED We will work with the applicant to issue building numbers after the project is approved.
03/30/2023 External Reviewers - Tucson Electric Power (TEP) NOT REQUIRED
11/22/2022 CDRC Post Review Express PENDING ASSIGNMENT
11/16/2022 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Arizona Auto Parts – Phase 2
Development Package (2nd Review)
DP22-0245

TRANSMITTAL DATE: November 16, 2022

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is August 25, 2023.

CONTENT REQUIREMENTS

1.COMMENT: Include the proposed storage building in the proposed coverage calculations.

This comment is still applicable, clarify if the trailer storage is actually trailer parking, if it is trailer storage it must adhere to 4.9.5.C.8 which states “ Outdoor storage, when permitted, shall not be located in a street perimeter yard “
2. COMMENT: 2-06.4.7.A.4 – Clearly demonstrate on the plan how the requirements of 4.9.5.C.8 will be controlled for the entire area south of the Proposed 2,500 S. F. Storage Building along the entire street frontage.


If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
11/22/2022 NPPO REVIEW COMPLETED
11/22/2022 Site Engineering REVIEW COMPLETED
03/30/2023 Site Landscape REVIEW COMPLETED