Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.3
Permit Number - DP22-0226
Review Name: DEVELOPMENT PACKAGE REVIEW v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/18/2023 | Commercial Plumbing | APPROVED | |||
05/26/2023 | External Reviewers - Tucson Airport Authority | APPROVED | RE: DP22-0226, Tentative Plat / Flexible Lot Development - Shiner Armory Park, Lots 1 through 6, 275 E 18th St, 2nd Submittal, Received May 23, 2023 To whom this may concern, Thank you for the opportunity to comment on DP22-0226, 2nd Submittal, the development plan for SF drive-through coffee shop with customer walk-up window, 275 E 18th St. This development is located in the S.W. corner of the S.E. quarter of Section 13, Township 14S, Range 13E, of the Gila and Salt River Meridian. The development site occupies parcel numbers 117-07-297A and 117-07-3000, covers approximately 0.42 ± acres, and is zoned for Historical Residential 3 (HR-3). The nearest major roadway intersection South 4th Avenue and East 18th Street, approximately 30 feet to the southeast of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the 2 nd submittal of this project and has no additional comments to provide. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520- 573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning |
||
05/10/2023 | Site Engineering | APPROVED | |||
04/20/2023 | Site Landscape | APPROVED | Please note that in the event that the right of way is needed for road widening or utilities, the water harvesting basin and landscape borders are required to be recreated or a DDO applied to satisfy Code requirements. | ||
05/02/2023 | Site Zoning | APPROVED | |||
05/26/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
05/15/2023 | Historic | REQUIRES RESUBMIT | Revise plans to note where the existing sidewalk and curb stamps are located. There are three, including a WPA stamp, at the southwest corner and two stamps on the curbs at the southeast corner. Include a note that all the stamps will be protected and maintained during construction. All stamps should be protected and maintained in their current locations. If the stamps are expected to be impacted, you should 1) take a mold of the stamp, 2)saw cut out the stamp with a 2" border, 3) remove and protect the stamp during construction, and 4) install the stamp in the same or near the original location. If the original stamp is damaged during the process the mold can be used to recreate it. |
||
05/23/2023 | Traffic Engineering Review | REQUIRES RESUBMIT | DP22-0226 2nd Comments: (Pg. 4- Site Plan) 1. Any existing curb, sidewalk and curb access ramps which are not compliant with current standards will be modified or replaced to meet current standards. 2. Keynote No. 15 must be corrected to read, “Concrete Curb.” Concrete Header is not to be installed at these locations. Where these driveway locations are the new depression must be Concrete Curb per P.A.G. standard 209. 3. Delete Keynote No. 17. Curb Transitions do not apply at these locations. The driveway aprons will have Concrete Curb “Wings.” David Stiffey DTM Project Coordinator David.Stiffey@tucsonaz.gov |
||
01/17/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
04/13/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
04/27/2023 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | SENT FYI EMAIL PER SOP. |