Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.1
Permit Number - DP22-0169
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/23/2022 | Site Landscape | APPROVED | |||
03/02/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
03/02/2023 | Site Engineering | REQUIRES RESUBMIT | 1. Correct discrepancies between Culvert Summary and detail 5/C2. 2-36”x96’ culverts are present at STA 265+90, schedule in detail 5/C2 calls out a single pipe at STA265+90. 2. Apron detail 5 section calls out Wire Tied Rip Rap, Plan view shows dumped or Slope mattresses. Per the schedule in this detail, please revise all notes to reflect Wire Tied RIPRAP. 3. Section 3/C1 needs revision sloped end of spillway varies L-4’, end of spillway =4’ 4. Detail 6/C2 shows typical sections including headwall treatment. Identify location of this headwall treatment or remove. 5. Paving profiles on sheets 13 & 14 are illegible at the grade breaks. Please revise to eliminate overlapping text. 6. Provide a construction coordination plan related to the 3-36 RCP Culvert at STA 262+35.54 that is referred to as “Improvements (By Others)”. How do anticipate construction phasing for this to prevent conflict or incorrect placement. Joshua Garcia Engineering Associate Joshua.garcia@tucsonaz.gov |
||
01/25/2023 | ROW Engineering Review | REVIEW COMPLETED | No Comments |