Permit Number: DP22-0165
Parcel: 14041127C

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - DP22-0165
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/05/2022 Fire New Construction APPROVED
11/14/2022 Site Engineering APPROVED 1. Critical Basin Retention requires post development stormwater flows to be limited to 85% of predevelopment conditions. The drainage report seems to have been prepared with a 90% of predevelopment conditions standard. The 85% standard is met and exceeded by this design and this comment is just for future reference.

Faffs Riederer
faffs.riedererTucsonaz.gov
11/08/2022 Site Landscape APPROVED
12/05/2022 CDRC Post Review Express PENDING ASSIGNMENT
11/08/2022 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Alvernon Way Distribution Center – Building 2
Development Package (2nd Review)
DP22-0165

TRANSMITTAL DATE: November 8, 2022


COMMENTS: Resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is June 16, 2023.

CONTENT REQUIREMENTS


This comment is still applicable please provide the DP case number on sheet 20
1. COMMENT: 2-06.4.3 – Provide the development package case number, DP22-0165, adjacent to the title block on all sheets.




This comment is still applicable. Revise the provided parking spaces total as it is incorrect.

7. COMMENT: 2-06.4.9.H.5.a – Provide a vehicle parking space calculation on the plan. This calculation shall provide the number of required and provide standard vehicle parking spaces, required and provided accessible vehicle parking spaces to include required and provided van accessible vehicle parking spaces. Until Comment 4 is addressed correctly vehicle parking requirements cannot be verified.






This comment is still applicable, Please clarify the location of the Long term bicycle parking spaces. Ensure that the Parking spaces are in compliance with UDC 7.4.9 Bicycle parking design criteria.
11. COMMENT: 2-06.4.9.H.5.d – Provide a Short- & Long-term bicycle parking space calculation on the plan the provides the number required and provided. Until Comment 4 is addressed correctly bicycle parking requirements cannot be verified.


This comment is still applicable, The easement is shown the under the northeast corner of the propose building
14. COMMENT: 2-06.4.9.L – There is a proposed “30’ INGRESS/EGRESS/SEWER & INCIDENTAL PROPOSED EASEMENT” shown under the northeast corner of the propose building. This easement shall not be located under the proposed building, revise the easement and provide the recordation information.


This comment is still applicable.
15. COMMENT: 2-06.4.9.Q – Provide the height & use within the footprint on the site plan.




This comment is still applicable.
17. COMMENT: 2-06.4.9.R – Show the required continuous pedestrian circulation path to the dumpster areas on the plan, see TSM Section 7-01.3.3.B.






If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov
RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
11/07/2022 CDRC Application Completeness Express REVIEW COMPLETED