Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.1
Permit Number - DP22-0152
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/14/2025 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 08/14/2025 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 08/14/2025 | Commercial Plumbing | PENDING ASSIGNMENT | |||
| 08/14/2025 | Fire New Construction | PENDING ASSIGNMENT | |||
| 08/14/2025 | NPPO | PENDING ASSIGNMENT | |||
| 08/14/2025 | ROW Engineering Review | PENDING ASSIGNMENT | |||
| 08/14/2025 | Site Engineering | PENDING ASSIGNMENT | |||
| 08/14/2025 | Site Landscape | PENDING ASSIGNMENT | |||
| 08/14/2025 | Site Zoning | PENDING ASSIGNMENT | |||
| 08/14/2025 | OK to Submit - Zoning Fast | REQUIRES RESUBMIT | Provide an updated project data table, including uses and zoning, for the site as a whole, to include expansion calculations. The lot coverage calculation -- separate from the expansion calculation -- should not include roofed areas that are open on at least two sides, including the covered patio. The submitted plan indicates this site is C-3. The site is C-3 and I-1; please annotate this correctly and draw the zoning boundary on the site plan. Provide an updated parking calculations table. Please be aware that any outdoor serving area is counted as gross floor area for the purposes of determining minimum parking calculations. |
||
| 08/11/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 08/11/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 08/13/2025 | OK to Submit - Landscape Fast | REVIEW COMPLETED |