Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP22-0136
Parcel: 11808033A

Review Status: In Review

Review Details: DEVELOPMENT PACKAGE REVIEW v.2

Permit Number - DP22-0136
Review Name: DEVELOPMENT PACKAGE REVIEW v.2
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
N/A CDRC Post Review Express PENDING ASSIGNMENT
N/A Site Zoning PENDING ASSIGNMENT
11/25/2026 Site Engineering REQUIRES RESUBMIT Permit Activity Number: DP22-0136 (REV 1 - 1st Review)
Project: Rev 1-Site/Grading/SWPPP - Farmington Expo. Conc. pad for swap meet/auction.
Location: 1114 S FARMINGTON RD
Review Date: 11/25/2026
Reviewer: Marco Contreras – Engineering Associate & Joe Macaulay – Civil Engineer
Reviewer Contact Information: marco.contreras@tucsonaz.gov
Related cases:

Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.
The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Review Comments:
1. Easement and ownership. Revision required: The plans note a drainage easement per Dkt. 84 of Misc. Rec., Pg. 49 with limits not defined. Provide a survey-based determination of the easement limits. Show all work relative to the parcel boundaries (036B, 037C, and 033A) and provide owner authorization for any work outside the applicant's property.
2. Wash maintenance access – demonstrate how maintenance within the wash will occur. This may require that a maintenance access ramp be provided for proper access.

Drainage Report Comments:
3. Drainage Document – Provide the following in table form within the drainage report:
a. both the Existing and proposed hydraulic cross-sections through the entire improvement reach.
b. Existing versus proposed 100-year water surface elevations.
c. Existing versus proposed flow velocities.
4. Provide an inspection and maintenance protocol including frequency of inspection, a checklist of items to be inspected and recommended maintenance when an inspection identifies a maintenance requirement and shall be prepared by an Arizona registrant. The protocol may be included in the project drainage report or prepared as a separate document. The protocol shall be reviewed and approved by the Floodplain Administrator prior to approval of the tentative plat or development plan. The protocol shall be delivered to the entity responsible for inspection and maintenance. An example of a detention basin inspection and maintenance checklist is provided in Appendix F. DSSDR 4.1.1. [Drainage Manual 2.3.1.6.C] The protocol must cover this project’s actual facilities as shown through the plan set.
d. Ensure this protocol is provided clearly in the appendix of the report
5. A Long-Term Maintenance Responsibility section is absent from the report. This section is required by Drainage Manual Section 2.3.1.2.E and must identify the entity responsible for maintaining all proposed drainage improvements, including the proposed bank protection along Old Julian Wash, outlet structures, and any riprap erosion protection. [Drainage Manual 2.3.1.2.E]
11/04/2026 CDRC Application Completeness Express REVIEW COMPLETED
11/12/2026 CDRC Review Coordinator Express REVIEW COMPLETED External reviewers are not required. No further action is required from the customer at this time.
11/05/2026 OK to Submit - Engineering Fast REVIEW COMPLETED
11/10/2026 OK to Submit - Zoning Fast REVIEW COMPLETED