Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP22-0134
Parcel: 14048003A

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW REVISION v.1

Permit Number - DP22-0134
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/11/2024 Commercial Plumbing APPROVED
12/19/2024 Site Landscape APPROVED
12/20/2024 CDRC Post Review PENDING ASSIGNMENT
12/11/2024 Fire New Construction REQUIRES RESUBMIT Dead ends in excess of 150’ require turn-around. IFC 24, D103.4
Questions: patricia.shelton@tucsonaz.gov
12/18/2024 Site Engineering REQUIRES RESUBMIT 1. Provide hydraulic calculations for the newly proposed storm drain pipes in the drainage addendum. Provide a profile of the storm drain pipes in the plan set.

Mike Ortiz
michael.ortiz@tucsonaz.gov
12/20/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Maintenance Hanger Facility – 3615 E Aeronautical Way
Development Package (Revision 1, 1st Review)
DP22-0134

TRANSMITTAL DATE: December 20, 2024

DUE DATE: December 18, 2024

COMMENTS: Resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is May 22, 2023.

CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.9.H.5.d – Show the proposed location of the long-term bicycle parking and provide a detail that clearly demonstrates how the requirements of UDC Article 7.4.9.D are met.

2. COMMENT: 2-06.4.9.R – The proposed 5.0’ sidewalk shown along the south side of the new vehicle parking area will not meet the minimum 4-0’ wide requirement of TSM Section 7-01.4.3.A when a parking vehicle is allowed to overhang 2’-6”.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter.
11/27/2024 CDRC Application Completeness REVIEW COMPLETED
12/09/2024 CDRC Review Coordinator REVIEW COMPLETED External Reviewers not required. No further action is required from the customer at this time.
12/06/2024 OK to Submit - Engineering REVIEW COMPLETED
12/05/2024 OK to Submit - Zoning REVIEW COMPLETED
12/19/2024 TW New Development Review REVIEW COMPLETED DP22-0134 - Development Package NEW Revision v1 - 3615 E AERONAUTICAL WY

Tucson Water has no objections to Revision #1 of DP22-0134

Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov