Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP22-0117
Parcel: 11450004K

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.3

Permit Number - DP22-0117
Review Name: DEVELOPMENT PACKAGE REVIEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/07/2023 Commercial Plumbing APPROVED
03/29/2023 CDRC Post Review Express PENDING ASSIGNMENT
03/08/2023 Fire New Construction REQUIRES RESUBMIT Building has a fire flow requirement of 2,000 GPM, therefore you need 2 fire hydrants within 400' of the building. The northern hydrant is 452' from the building. You shall either install another fire hydrant or a fire sprinkler system.

Questions:

Jennifer Peel-Davis
Tucson Fire Department
Fire Plans Examiner
Fire Inspector I, II and Fire Alarm Plans Examiner
Jennifer.Peel-Davis@Tucsonaz.gov
Desk: 520-837-7033
03/29/2023 Site Engineering REQUIRES RESUBMIT 1. Comment 2 was not properly addressed: Inside edge of bollard must be at least 1' from inside edge of waste enclosure (TSM 8-01.5.2B)

Scott Haseman
scott.haseman@tucsonaz.gov
03/08/2023 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL



TO: Development Services Department

Plans Coordination Office

FROM: Paul Camarena

PDSD Zoning Review Section



PROJECT: 8300 E TANQUE VERDE RD

Development Package (3rd Review)

DP22-0117

TRANSMITTAL DATE: March 8, 2023


COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June 9 , 2022 .



This comment is still applicable the proposed lot coverage for the new build is incorrect. On the lot coverage calculation the new building is 1,481 sf but on the site plan it the new building is 5,550 sf please clarify.

2-06.4.7.A.8.b - Percentage and area in square feet of building and accessory building coverage;
COMMENT: 2-06.4.7.A.8.b - Provide the information noted by the standard above. In the SR zone the lot coverage maximum for Nonres is 15%. If this site is not able to adhere to the to the 15% maximum lot coverage a Board of Adjustment for Variance will be required. Board of Adjustment requirements and application can be found at: https://www.tucsonaz.gov/files/pdsd/codes/Zoning_Administration_Application_BA_fillable.pdf. The Board of Adjustment is a separate submittal from the building plan and is submitted at: https://www.tucsonaz.gov/pdsd-filedrop, using the Submission Type “Zoning Administration”. Contact Mark Castro at Mark.Castro@tucsonaz.gov if you have any questions about the Board of Adjustment.





***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations



If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package