Permit Number: DP22-0094
Parcel: 10605001C

Address:
3939 N ORACLE RD

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.3

Permit Number - DP22-0094
Review Name: DEVELOPMENT PACKAGE REVIEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/13/2023 CDRC Post Review Express PENDING ASSIGNMENT
02/13/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Chase Bank – Covered Parking W/Solar
3939 N Oracle Rd
Development Package (3rd Review)
DP22-0094

TRANSMITTAL DATE: February 13, 2023

DUE DATE: February 17, 2023

COMMENTS: The following comments were not addressed. The last submittal was a two (2) sheet submittal and now the DP set has twenty-four (24) sheets. Resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is April 10, 2023.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

CONTENT REQUIREMENTS

1. This comment was not addressed. COMMENT: 2-06.4.3 – Provide the development package case number, DP22-0094, adjacent to the title block on all sheets.

2. This comment was not addressed. COMMENT: 2-06.4.4 - The project-location map to be located on the first sheet of the development package in the upper right corner, shall cover approximately one square mile, be drawn at a minimum scale of three-inch equals one mile, and provide the following information

3. This comment was not addressed. COMMENT: 2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and,

4. This comment was not addressed. COMMENT: 2-06.4.4.C - Section, township, and range; section corners; north arrow; and the scale will be labeled.

2-06.4.9 - Information on Proposed Development

The following information on the proposed project shall be shown on the drawing or added as notes.

5. This comment was not addressed. COMMENT: 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined.

6. This comment was not addressed. COMMENT: 2-06.4.9.Q – Provide the square footage and height of the shade structures within the footprint of the shade structure.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package