Permit Number: DP22-0090
Parcel: 133152870

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - DP22-0090
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/12/2023 CDRC Post Review Express PENDING ASSIGNMENT
01/12/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Chase Bank – Covered Parking W/Solar
7070 E Tanque Verde Rd
Development Package (2nd Review)
DP22-0090

TRANSMITTAL DATE: January 12, 2023



COMMENTS: Resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is April 07, 2023.

2-06.3.0 FORMAT REQUIREMENTS

These comment are still applicable.
1. COMMENT: 2-06.3.7 - A small, project-location map shall be provided in the upper right corner of the cover sheet. The location map shall meet the requirements listed in comments 2-5.

2. COMMENT: 2-06.4.4 - The project-location map to be located on the first sheet of the development package in the upper right corner, shall cover approximately one square mile, be drawn at a minimum scale of three-inch equals one mile, and provide the following information

3. COMMENT: 2-06.4.4.A – Show the subject property approximately centered within the one square mile area;

4. COMMENT: 2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and,

5. COMMENT: 2-06.4.4.C - Section, township, and range; section corners; north arrow; and the scale will be labeled.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

This comment is still applicable please provide a note.
6. COMMENT: 2-06.4.7.A.6.a – As Tanque Verde Rd is designated as an Arterial on the COT MS&R map provide a general note stating “THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R)”

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.


7. COMMENT: 2-06.4.8.B – Provide recordation information for all existing easements shown on the plan.

This comment is still applicable, The right of way information is not correct, the proposed width is 150 on tanque verde rd .
8. COMMENT: 2-06.4.8.C - The following information regarding Tanque Verde Rd & Sabino Canyon Rd shall be provided: the name, right-of-way width, dimensioned width of paving, curbs, curb cuts, and sidewalks.

This comment is still applicable.

9. COMMENT: 2-06.4.9.Q – Provide the square footage and height of the shade structures within the footprint of the shade structure.
10.COMMENT: Per UDC section 7.4.6.F.2.a.1: Access lanes and PAALs must be setback at least one foot from:(1) An open structure , such as a carport or covered pedestrian access path as measured from the closest part of the structure or roof overhang


If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
12/27/2022 CDRC Application Completeness Express REVIEW COMPLETED