Permit Number: DP22-0074
Parcel: 140360170

Address:
4975 E BENSON HY

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.2

Permit Number - DP22-0074
Review Name: DEVELOPMENT PACKAGE REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/02/2023 Commercial Plumbing APPROVED
03/06/2023 Site Engineering APPROVED
03/10/2023 CDRC Post Review PENDING ASSIGNMENT
03/02/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: QuickTrip No. 1499
Development Package (3rd Review)
DP22-0074

TRANSMITTAL March 2, 2023

DUE DATE: March 9, 2023

COMMENT: Resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is May 10, 2023.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

1. Until the dedication is complete Zoning cannot approve the DP. COMMENT: 2-06.4.9.I – The proposed right-of-way dedication called out on the plan will need to be completed prior to approval of this DP.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
03/10/2023 Traffic Engineering Review REVIEW COMPLETED DP22-0074
4975 E. Benson Hwy.

Comments:
1. A PIA is going to be required for this project. https://www.tucsonaz.gov/tdot/private-improvement-agreement Contact TDOT Engineering for information. DOT-Engineering-Review-Section@tucsonaz.gov Or call. 520-791-5100 Jesus Villezcas

David Stiffey
DTM Project Coordinator