Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP21-0361
Parcel: 12108047A

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - DP21-0361
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/13/2022 Site Engineering APPROVED
12/12/2022 Site Landscape APPROVED
12/13/2022 CDRC Post Review Express PENDING ASSIGNMENT
11/30/2022 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL



FROM: PDSD Zoning Review



PROJECT: Rook Bellevue Homes – Multi-Family – R-3

Development Package (3rd Review)

DP21-0361



TRANSMITTAL DATE: November 30, 2022



DUE DATE: December 18, 2022



COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.



This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).



Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is December 9, 2022.



2-06.4.9 - Information on Proposed Development

The following information on the proposed project shall be shown on the drawing or added as notes.



This comment was not fully addressed correctly. Perimeter yard setbacks are based on a measurement from design grade to the highest point of the exterior wall, UDC Article 6.4.5.B & Figure 6.4.5-A. Based on a wall height of 13’-8”, 10’-8” + 3’-0” to top of wall, the required street perimeter yard setback is 20’-6”, provided is 20’-0”. COMMENT: 2-06.4.9.O – Per UDC Article 6.4.5.C.1.a Within established areas , the minimum required front street perimeter yard is 20 feet or one and one-half the height of the proposed wall (H), measured from the street property line, whichever is greater, up to a maximum of 90 feet. Based on the 25’ height provided under “SITE INFORMATION” the requirement front street perimeter yard setback is 37’-6”, proposes front street perimeter yard setback is 20.0’. A Design Development Option (DDO) must be submitted and approved to reduce the required setback,

DDO application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. A DDO is a separate submittal from the building plan and shall be submitted at: https://www.tucsonaz.gov/pdsd-filedrop, using the Submission Type “Zoning Administration”. If you have questions about the DDO application or process please contact Mark Castro at Mark.Castro@tucsonaz.gov.



If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.



RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
11/29/2022 CDRC Application Completeness Express REVIEW COMPLETED