Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - DP21-0326
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/19/2024 | Commercial Plumbing | APPROVED | |||
| 04/26/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | April 25, 2024 WO#T19779 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: 4253 East Flower St DP21-0326 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 3/19/2024. There are existing facilities within the development which are depicted upon the plan; further, please be advised of private underground electric facilities. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our land Resources Department, TEPDEVREV@tep.com. Should you have any technical questions, please contact the area designer, Chuck Leon (520) 400-6133 cleon@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 04/18/2024 | Site Engineering | APPROVED | |||
| 03/13/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 04/26/2024 | CDRC Post Review Express | REVIEW COMPLETED | |||
| 03/27/2024 | CDRC Review Coordinator Express | REVIEW COMPLETED | Review request email sent per TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
| 03/27/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
| 03/27/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
| 03/27/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
| 04/17/2024 | New Services/JOC | REVIEW COMPLETED | DP21-0326 - Development Package NEW v1 – Crown Estates Tucson Water approves the development package subject to the following condition. 1. Sheet 5: Clarify Water Keynote 8 by revising it to read, NEW PUBLIC 4” FIRE SERVICE LINE STUB PER SEPARATE PLAN AND PERMIT. PLACE 4” X 2” REDUCER ON THE PRIVATE SIDE OF THE 4” VALVE AT THE EDGE OF THE TUCSON WATER EASEMENT (SEE SEPARATE PUBLIC WATER PLAN) TO CONNECT TO THE PRIVATE 2” FIRE SYSTEM Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |
||
| 03/15/2024 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 03/19/2024 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
| 03/21/2024 | OK to Submit - Zoning Fast | REVIEW COMPLETED |