Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.1
Permit Number - DP21-0297
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/07/2023 | CDRC Application Completeness | APPROVED | |||
04/17/2023 | Commercial Plumbing | APPROVED | |||
03/17/2023 | NPPO | APPROVED | |||
03/17/2023 | Site Landscape | APPROVED | |||
04/17/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
04/07/2023 | Site Engineering | REQUIRES RESUBMIT | 1. A cross access agreement/easement will be required to allow entry/exit through the parcel to the east of the proposed parking lot entrance Scott Haseman scott.haseman@tucsonaz.gov |
||
04/04/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Brake Masters – Grant & Swan Development Package (3rd Revision – 1st Review) DP21-0297 TRANSMITTAL DATE: April 4, 2023 DUE DATE: April 13, 2023 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is October 31, 2022. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 1. COMMENT: 2-06.4.9.L – It appears that cross vehicle & pedestrian is proposed with the parcel to the east, provide a copy of the recorded access agreement or easement. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
03/15/2023 | CDRC Review Coordinator | REVIEW COMPLETED | EXTERNAL REVIEWS NOT NEEDED | ||
04/07/2023 | Fire New Construction | REVIEW COMPLETED | |||
03/09/2023 | OK to Submit - Engineering | REVIEW COMPLETED | |||
03/07/2023 | OK to Submit - Landscape | REVIEW COMPLETED | |||
03/09/2023 | OK to Submit - Zoning | REVIEW COMPLETED | |||
04/14/2023 | ROW Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |