Permit Number: DP21-0249
Parcel: 11921012E

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - DP21-0249
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/28/2022 Commercial Plumbing APPROVED
01/04/2023 External Reviewers - Pima County Addressing APPROVED EXTERNAL] DP21-0249
Nicholas Jordan
CDRC
Jeff Stanley <stanley19263@msn.com>
Good afternoon,



Pima County Addressing approves DP21-0249.





Thank you



Nicholas Jordan

Site Review Project Manager - Addressing Official

Pima County Development Services Department

201 N Stone AV – 1st Floor

Tucson, AZ 85701

(520) 724-9623
12/01/2022 Site Landscape APPROVED
01/04/2023 CDRC Post Review Express PENDING ASSIGNMENT
12/13/2022 Site Engineering REQUIRES RESUBMIT 1. Show cover between CMP and top of ground, show this meets manufacture's standards
2. By the amendment to Tucson Retention/Detention Manual 4.9.1.8, bleed pipes off of basins must be capped and used for maintenance only, unless a waiver is granted by the city engineer by section 9 of the same document. This waiver will be determined based on a soils report proving insufficient infiltration within the basin retention volume
3. Show the riprap on the site plan for the inlet 3' spillway, and include a detail showing it meets the requirements of the Tucson Drainage Manual and Retention/Detention Manual
4. Correct callout 57 with the correct detail number
5. Include a security barrier between the sidewalk and the 2:1 sloped rip raps of the CMPS and along the pedestrian path adjacent to the 3:1 Eastern section of the wash
6. By the updated retention detention manual 4.11.1, any basin with a water depth of over 2 ft and a side slope steeper of 4:1 needs a security barrier along the side slopes. Please ensure this is shown on the sides of the basin that border lots
7. Ensure there is at least 6" freeboard between top of both detention basins and their WSEL's
8. Ensure the chosen Manning's coefficients are consistent with Table 8.1 of the drainage manual. Preferably, the coefficients would be inbetween the "normal" and "maximum" values. As the wash currently looks very overgrown with trees and shrubs, and you plan on adding rip-rap to much of it, n should be increased to a minimum of .035
9. Correct diameter of CMPS to 48" in "Culvert, Scuppers, and Channel" Section of drainage report
10. Provide a complete backwater analysis to show culvert does not adversely impact upstream conditions.
11. Provide erosion protection at the outlet of the culvert, including headwall or rip-rap
12. Show how assumed WSEL's that were used in the Manning's calculations were derived/found
Scott Haseman
scott.haseman@tucsonaz.gov
11/22/2022 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL



FROM: PDSD Zoning Review



PROJECT: Val-Val, Lots 1-11

Development Package (2nd Review)

DP21-0249



TRANSMITTAL DATE: November 22, 2022



DUE DATE: December 18, 2022



COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.



This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).



Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is September 14, 2022.



2-06.4.8 - Existing Site Conditions

The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.



This comment must be addressed prior to approval of this DP.COMMENT: 2-06.4.8.B – All easements shown on the plan to be abandoned shall be abandoned prior to approval of this DP. Provide the recordation information for the abandonment on the plan.



2-06.4.9 - Information on Proposed Development

The following information on the proposed project shall be shown on the drawing or added as notes.



It does not appear the the setbacks are correct. Per UDC Article 6.5.4.C.2.b.(1).(b) The 18-foot parking space shall be no closer than one foot from back of sidewalk of the street from which access is gained. Show the required 1’-0” setback to the sidewalk. COMMENT: 2-06.4.9.O – Detail 4 sheet 5 the front yard setback show is not correct, see comment above.



If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.



RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
11/18/2022 CDRC Application Completeness Express REVIEW COMPLETED