Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.1
Permit Number - DP20-0173
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/10/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
05/10/2023 | CDRC Review Coordinator | PENDING ASSIGNMENT | |||
05/10/2023 | Fire New Construction | PENDING ASSIGNMENT | |||
05/10/2023 | NPPO | PENDING ASSIGNMENT | |||
05/10/2023 | Site Engineering | PENDING ASSIGNMENT | |||
05/10/2023 | Site Landscape | PENDING ASSIGNMENT | |||
05/10/2023 | Site Zoning | PENDING ASSIGNMENT | CDRC TRANSMITTAL PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TAC2 – New Shell Building Development Package (OK to Submit - Revision #13) DP20-0173 TRANSMITTAL DATE: May 09, 2023 DUE DATE: May 15, 2023 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2-06.3.0 FORMAT REQUIREMENTS 1. COMMENT: 2-06.4.7.A.4 – Add the proposed accessory use, “HAZARDOUS MATERIAL STORAGE, SUBJECT TO USE SPECIFIC STANDARDS 4.9.10.B.1 & 2.d”, to General Note 3. Clearly demonstrate on the plan that all requirements of UDC Use Specific Standards 4.9.10.B.1 & 2.d are met. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
05/09/2023 | OK to Submit - Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TAC2 – New Shell Building Development Package (OK to Submit - Revision #13) DP20-0173 TRANSMITTAL DATE: May 09, 2023 DUE DATE: May 15, 2023 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2-06.3.0 FORMAT REQUIREMENTS 1. COMMENT: 2-06.4.7.A.4 – Add the proposed accessory use, “HAZARDOUS MATERIAL STORAGE, SUBJECT TO USE SPECIFIC STANDARDS 4.9.10.B.1 & 2.d”, to General Note 3. Clearly demonstrate on the plan that all requirements of UDC Use Specific Standards 4.9.10.B.1 & 2.d are met. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
05/08/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
05/10/2023 | OK to Submit - Engineering | REVIEW COMPLETED | No substantial review required | ||
05/09/2023 | OK to Submit - Landscape | REVIEW COMPLETED |