Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.1
Permit Number - DP20-0060
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/04/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
05/04/2023 | CDRC Review Coordinator | PENDING ASSIGNMENT | |||
05/04/2023 | Commercial Plumbing | PENDING ASSIGNMENT | |||
05/04/2023 | Fire New Construction | PENDING ASSIGNMENT | |||
05/04/2023 | NPPO | PENDING ASSIGNMENT | |||
05/04/2023 | ROW Engineering Review | PENDING ASSIGNMENT | |||
05/04/2023 | Site Engineering | PENDING ASSIGNMENT | |||
05/04/2023 | Site Landscape | PENDING ASSIGNMENT | |||
05/04/2023 | Site Zoning | PENDING ASSIGNMENT | |||
05/03/2023 | OK to Submit - Landscape | REQUIRES RESUBMIT | PROJECT: DUTCH BROS COFFEE – NWC OF FORT LOWELL & CAMPBELL ACTIVITY NO. DP-20-0060 ADDRESS/PARCEL: 3205 N CAMPBELL AV/113-06-142J ZONING: C-1 COMMENTS: 1. A Commercial Rainwater Harvesting plan is required per UDC Technical Standards Manual – Section 4-01.3.0. and Section 5-01.0.0 Landscaping and Screening. Adherence to the Low Impact Development Standards outlined in Section 5 of the PCRFCD Design Standards for Stormwater Detention and Retention is required and shall work in conjunction with the Commercial Rainwater Harvesting design. Using Low Impact Development design and water harvesting provides critical basin detention and first flush retention for all new development and impervious area. The newly adopted Detention/Retention Manual can be found: https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-final-201406-manual.pdf With CoT edits to the manual are found at: https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988 |
||
05/04/2023 | OK to Submit - Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Section Manager PROJECT: Dutch Bros- NWC of Fort Lowell & Campbell Development Package (2nd Review) DP20-0060 TRANSMITTAL DATE: May 4, 2023 DUE DATE: May 9, 2023 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is March 17, 2021. CONTENT REQUIREMENTS 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 1. As you are proposing not to combine the lots and cross access & parking is proposed, a Covenant Regarding Development and Use of Real Property will need to be executed and recorded along with a cross access/parking agreement will need to be recorded prior to approval of this DP. The covenant can be found at: https://www.tucsonaz.gov/files/pdsd/Covenant_Regarding_Development_and_Use_of_Real_Property_UDC.pdf. 2-06.4.9.A – A lot combination will need to be completed prior to approval of the development package. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
05/02/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
05/03/2023 | OK to Submit - Engineering | REVIEW COMPLETED |