Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - DP19-0308
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/28/2023 | External Reviewers - Tucson Airport Authority | APPROVED | July 27, 2023 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: DP19-0308, GRADING/SWPPP - 22nd Street Expo, 993 S FREEWAY TUCSON, AZ 85745 Received July 6, 2023 To whom this may concern, Thank you for the opportunity to comment on DP19-0308, the development plan for 22nd Street Expo, a new waterline and restroom facility which is contained within an existing tent structure at 993 S Freeway. This development is located in the S.E. quarter of the S.E. quarter of Section 14, Township 14S, Range 13E, of the Gila and Salt River Meridian. The development site occupies parcel number 116-23-154D and 116-23-155B, covers approximately 2,500 ± sq ft, and is zoned as Light Industrial Zone (I-1). The nearest major roadway intersection is S Freeway and Interstate 10, approximately 300 feet to the southwest of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area and FAA Part 77 airspace. The Tucson Airport approves the proposed project and is not requiring a resubmit of this project. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520- 573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning **see attachments for approval letter** |
||
| 07/28/2023 | New Services/JOC | APPROVED | No comments. Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |
||
| 07/07/2023 | Site Engineering | APPROVED | |||
| 07/05/2023 | Site Zoning | APPROVED | |||
| 07/06/2023 | NPPO | NOT REQUIRED | |||
| 07/06/2023 | Site Landscape | NOT REQUIRED | |||
| 08/01/2023 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 07/18/2023 | Commercial Plumbing | REQUIRES RESUBMIT | An existing 6” sewer runs under the proposed building. Verify that the material of the sewer is listed for use under a building and that the burial depth of the sewer will not cause structural issues Reference: Sections 307.1 and 702.2, IPC 2018. | ||
| 08/01/2023 | Historic | REQUIRES RESUBMIT | Plans should include information on how the eligible railroad tracks will be protected during any trenching, grading or construction. Please note, that the site is located within the Archaeological Sensitivity Zone and work within the ROW will require a monitor or a waiver issued by the Historic Preservation Office. |
||
| 06/27/2023 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 07/05/2023 | CDRC Review Coordinator Express | REVIEW COMPLETED | FYI email sent to PAG, USPS, SWG & TEP per SOP. | ||
| 08/01/2023 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | DP19-0308 8/1/2023 Jay Gomes <jgomes@azdot.gov> CDRC Good Morning, ADOT has no comments on this DEV. Should traffic control devices be needed on the Frontage Road, an ADOT Encroachment Permit will be needed. Thank you for the opportunity to review. |
||
| 07/05/2023 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 07/05/2023 | External Reviewers - Southwest Gas | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 07/05/2023 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 07/05/2023 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
| 07/12/2023 | Fire New Construction | REVIEW COMPLETED | Provide Knox Box/Knox Lock at entry gates. | ||
| 06/28/2023 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 07/17/2023 | Traffic Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |