Permit Number: DP19-0308
Parcel: 116232100

Address:
1007 S FREEWAY

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - DP19-0308
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/28/2023 External Reviewers - Tucson Airport Authority APPROVED July 27, 2023
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: DP19-0308, GRADING/SWPPP - 22nd Street Expo, 993 S FREEWAY TUCSON, AZ 85745
Received July 6, 2023
To whom this may concern,
Thank you for the opportunity to comment on DP19-0308, the development plan for 22nd Street
Expo, a new waterline and restroom facility which is contained within an existing tent structure
at 993 S Freeway. This development is located in the S.E. quarter of the S.E. quarter of Section
14, Township 14S, Range 13E, of the Gila and Salt River Meridian. The development site
occupies parcel number 116-23-154D and 116-23-155B, covers approximately 2,500 ± sq ft,
and is zoned as Light Industrial Zone (I-1). The nearest major roadway intersection is S
Freeway and Interstate 10, approximately 300 feet to the southwest of the subject development.
This site does lie within the Tucson International Airport avigation easement requirements and
public disclosure area and FAA Part 77 airspace.
The Tucson Airport approves the proposed project and is not requiring a resubmit of this project.
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
**see attachments for approval letter**
07/28/2023 New Services/JOC APPROVED No comments.

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
07/07/2023 Site Engineering APPROVED
07/05/2023 Site Zoning APPROVED
07/06/2023 NPPO NOT REQUIRED
07/06/2023 Site Landscape NOT REQUIRED
08/01/2023 CDRC Post Review Express PENDING ASSIGNMENT
07/18/2023 Commercial Plumbing REQUIRES RESUBMIT An existing 6” sewer runs under the proposed building. Verify that the material of the sewer is listed for use under a building and that the burial depth of the sewer will not cause structural issues Reference: Sections 307.1 and 702.2, IPC 2018.
08/01/2023 Historic REQUIRES RESUBMIT Plans should include information on how the eligible railroad tracks will be protected during any trenching, grading or construction.
Please note, that the site is located within the Archaeological Sensitivity Zone and work within the ROW will require a monitor or a waiver issued by the Historic Preservation Office.
06/27/2023 CDRC Application Completeness Express REVIEW COMPLETED
07/05/2023 CDRC Review Coordinator Express REVIEW COMPLETED FYI email sent to PAG, USPS, SWG & TEP per SOP.
08/01/2023 External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED DP19-0308
8/1/2023
Jay Gomes <jgomes@azdot.gov>
CDRC
Good Morning,

ADOT has no comments on this DEV.
Should traffic control devices be needed on the Frontage Road, an ADOT Encroachment Permit will be needed.

Thank you for the opportunity to review.
07/05/2023 External Reviewers - Pima Association of Governments REVIEW COMPLETED Sent FYI emails per SOP.
07/05/2023 External Reviewers - Southwest Gas REVIEW COMPLETED Sent FYI emails per SOP.
07/05/2023 External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Sent FYI emails per SOP.
07/05/2023 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED Sent FYI emails per SOP.
07/12/2023 Fire New Construction REVIEW COMPLETED Provide Knox Box/Knox Lock at entry gates.
06/28/2023 OK to Submit - Zoning Fast REVIEW COMPLETED
07/17/2023 Traffic Engineering Review REVIEW COMPLETED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov