Permit Number: DP19-0279
Parcel: 11921011B

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.2

Permit Number - DP19-0279
Review Name: DEVELOPMENT PACKAGE REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/22/2023 Commercial Plumbing APPROVED
06/08/2023 Site Engineering APPROVED
06/14/2023 Site Landscape APPROVED
06/27/2023 Design Review NOT REQUIRED
06/27/2023 CDRC Post Review Express PENDING ASSIGNMENT
06/05/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Mission Hills FLD – Lots 1-14
Development Package (4th Review)
DP19-0279

TRANSMITTAL DATE: June 5, 2023

DUE DATE: June 23, 2023

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is October 14, 2022.

1. Zoning acknowledges the provided view corridor sheet but as stated before provide this information on the plan. COMMENT: 2-06.4.7.A.6 – Demonstrate on the plan that the requirements of UDC Article 5.3.6 are met.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.5.0 FLEXIBLE LOT DEVELOPMENT (FLD - ADDITIONAL REQUIREMENTS)

2-06.5.3 Additional Information
The following are required in addition to the requirements of the tentative plat or site plan, whichever is applicable:

2. This comment was not addressed. Per UDC Article 6.6.2.I.2 and Figure 6.6.1-A, the maximum retaining is 4’-0” with a 6’ wall on top. If the wall exceeds these heights the wall is required to meet perimeter yard setbacks or a Board of Adjustment for Variance is required. COMMENT: Terrace wall section & Cut wall section provide a dimension that shows that no more than 6’-0” wall is allowed above the retaining portion of the wall.

Additional Comments

3. This DP has expired as of October 14, 2022. Contact Nicholas Martell to see if an extension can be granted.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter.
05/24/2023 CDRC Application Completeness Express REVIEW COMPLETED
06/08/2023 Fire New Construction REVIEW COMPLETED