Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - DP19-0164
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/12/2023 | Commercial Plumbing | APPROVED | |||
06/22/2023 | NPPO | APPROVED | |||
07/03/2023 | Site Engineering | APPROVED | |||
06/22/2023 | Site Landscape | APPROVED | |||
07/06/2023 | Traffic Engineering Review | APPROVED | |||
07/12/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
07/10/2023 | Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Loran Shamis PDSD Zoning Review Section PROJECT: Northwest Medical Center – Solar Parking Canopies 2200 S HOUGHTON RD Development Package (1st Review) DP19-0164 CHECKLIST FOR MINOR DEVELOPMENT CHANGES TO EXISTING COMMERCIAL/INDUSTRIAL SITES 1. Zoning acknowledges the note stating the covered parking structures are not to extend past the parking stall and be setback 1’ to maintain 24’ wide minimum PAAL”. Please include Sheets C-04.01 and C-04.03 as they are a part of the original approved development package, and they are being revised with this proposal. On these sheets demonstrate on the site plan by clearly dimensioning the parking spaces, the 24’ PAAL and the 1’ setback. 2. Include illustration of the elevations with dimensions on the next submittal. If you have any questions about this transmittal, Contact Loran Shamis or at Loran.Shamis@Tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
06/14/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
06/20/2023 | CDRC Review Coordinator | REVIEW COMPLETED | No external reviewers nor added | ||
06/30/2023 | Fire New Construction | REVIEW COMPLETED | |||
06/20/2023 | OK to Submit - Zoning | REVIEW COMPLETED |