Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP17-0136
Parcel: 10818716A

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - DP17-0136
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/14/2023 Commercial Plumbing APPROVED
07/24/2023 Site Engineering APPROVED
07/11/2023 NPPO NOT REQUIRED
07/11/2023 Site Landscape NOT REQUIRED
08/09/2023 Traffic Engineering Review NOT REQUIRED
08/14/2023 CDRC Post Review PENDING ASSIGNMENT
08/02/2023 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Nathan Herrera
Planner

PROJECT:
Development Package (Revised DP Review)
DP17-0136

TRANSMITTAL DATE: August 02, 2023

DUE DATE: August 16, 2023

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Purpose
This standard has been prepared for the purpose of informing applicants of the submittal and review requirements for minor changes to existing commercial sites to assure proper and adequate information is presented in a consistent manner, thereby providing the basis for an efficient and timely review. The minor revisions to existing commercial sites are prepared in support of applications for building permits and related reviews.

The information that is requested establishes the basis upon which the project will be approved and could affect what is required of the property in the future, should there be a proposal for expansion or for a different use of the property. This standard does not waive any applicable city regulations or codes.

Applicability
This standard shall be used for minor changes to existing commercial sites such as but not limited to; expansions less than 25% in square footage of land area, floor area, lot coverage, or vehicular use area, modification to accessible vehicle parking, parking area restripe, etc. Applicability to be determined by Zoning and/or Engineering review staff via email or at PDSD review counter.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

2-06.4.0 Content Requirements:

1. 2-06.4.4.A - Show the subject property approximately centered within the one square mile area of the project location map.

COMMENT: Revise location map per the above standard.

2. 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

COMMENT: Clarify the existing food service use per UDC Section 4.8-4. List all associated Use Specific Standards of the existing use.


3. 2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual.

COMMENT: Provide a dimension for the sidewalk width for both sides of the proposed patio expansion to ensure the above requirements are met per TSM Section 7-01.4.3.

COMMENT: Aerials show a light pole that potentially could interfere with required pedestrian circulation standards. Identify the light pole on the site plan to ensure above standards will be met.


If you have any questions about this transmittal, please contact me at Nathan.Herrera@tucsonaz.gov or at 520-837-4894.


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
07/10/2023 CDRC Application Completeness REVIEW COMPLETED
07/11/2023 CDRC Review Coordinator REVIEW COMPLETED No external reviewers nor added.
07/27/2023 Fire New Construction REVIEW COMPLETED
07/10/2023 OK to Submit - Engineering REVIEW COMPLETED
07/10/2023 OK to Submit - Landscape REVIEW COMPLETED
07/11/2023 OK to Submit - Zoning REVIEW COMPLETED