Plan Number: CIP-0825-00021
Parcel: Unknown

Review Status: Approved

Review Details: CIP - DEV SITE + COMM STRUCTURE - INITIAL v.1

Plan Number - CIP-0825-00021
Review Name: CIP - DEV SITE + COMM STRUCTURE - INITIAL v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Real Estate NOT REQUIRED It appears all activity will be located inside property boundaries or is comprised of landscape. Any proposed improvements being constructed outside property lines and into public rights-of-way require a right-of-way permit and Private Improvement Agreement with the Department of Transportation & Mobility or Temporary Revocable Easement with the Real Estate Division (separate processes). If any action is required to address property rights (dedications, easements, etc), please contact the Real Estate Division 520-791-4181.
Zoning Administration NOT REQUIRED
Zoning Compliance Review NOT REQUIRED
Bldg Permits - Post Review Express REVIEW COMPLETED
Building Official REVIEW COMPLETED
CDRC Post Review Express REVIEW COMPLETED Please address all reviewers' comments for the next submittal. Acres of Disturbance was marked as 13- Therefore, a dust permit will be required.


FUGITIVE DUST ACTIVITY PERMIT MAY BE REQUIRED

If any of the following apply, a Fugitive Dust Activity Permit is required from the Pima County Department of Environmental Quality (PDEQ).

Earthmoving or Land Clearing over 1 acre

Trenching over 300 feet for utility installation or repair

Road construction over 50 feet

Blasting

Please contact the following to obtain your permit.

Fugitive Dust Activity Permit: Contact Pima County ADEQ at (520) 724-7400

 https://www.pima.gov/596/Fugitive-Dust

Once received you may upload your permit to the attachment section along with any external reviewer approval letters. If you have any questions regarding this information, please contact Sonya Bermudez at sonya.bermudez@tucsonaz.gov or 520-730-7979.

Once plans are 90-100% External Reviewers will be added. Thanks
Commercial Building REVIEW COMPLETED 1. Please provide the structural calculations used in the preparation of this project. INB 107.2.7 For example Pickle ball fence, shade and shade sail structures, bathroom structure, and light pole bases.
2. Provide complete construction drawings for the shade and shade sail structures, and bathroom structure
3. Provide engineering or the manufacturer’s installation instructions for the playground equipment.
Please contact me if you have any questions about these comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
Commercial Electrical REVIEW COMPLETED Commercial Electrical Review CIP-0825-00021 (101 W IRVINGTON RD TUCSON, AZ 85714)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

1. Provide a panel schedule for the new Splash Pad Control panel. Or reference the schematics on sheet SP-601 from sheet E3.0.
2. The equipment Room Plan on sheet SP-121 does not match the ‘Existing Equipment Room Electrical Plan’ shown on sheet E1.1. Provide consistent information and equipment locations.
3. Show or Note that all applicable electrical work shall comply with, Corrosive Environment – NEC 680.7, 680.14. REF Sheet E1.1, Electrical Plan – Splash Pad Equipment Room.
4. Provide Equipotential Bonding per 680.26. the splashpad shell, reinforcing steel, perimeter surfaces, metallic components, fixed metal parts, etc., shall be bonded per 680.26.


Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
Commercial Mechanical REVIEW COMPLETED
Commercial Plumbing REVIEW COMPLETED Show the FFE, finished floor elevation for both the splashpad and restroom facility, and the RIM elevation of the nearest upstream manhole on the site plan. Will be used to confirm whether a backwater valve is required
Entitlements REVIEW COMPLETED
Fire New Construction REVIEW COMPLETED No Comments
New Services/JOC REVIEW COMPLETED Based on the information provided, Tucson Water has no objections to, or comments on, the proposed development. If any new domestic water, irrigation water, or fire water services are needed to serve this proposed development, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov. Also, any modifications to existing Tucson Water infrastructure shall not be performed until Tucson Water New Services or New Development has notified and consulted. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to: Richard A. Sarti, P.E. (520) 400-4001
NPPO REVIEW COMPLETED
Outdoor Lighting REVIEW COMPLETED Outdoor Lighting Review CIP-0825-00021 (101 W IRVINGTON RD TUCSON, AZ 85714)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).

https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

1. Show lamps with a maximum of 3500K color temperature, OLC 402.1. Lighting fixtures PN2 and PN3 do not indicate the color temperature.
2. Indicate on the plans that a special inspection is required per sec. OLC 104.2.2, and 106.2.2. Provide Outdoor Lighting Special Inspection Certificate.

https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf

3. Specify any exceptions used. OLC 104.2.3, exception.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
Site Engineering REVIEW COMPLETED Permit: CIP-0825-00021
Location: 101 W IRVINGTON RD
Review Date: 9/8/2025
Site Engineering Comments:
1. Provide Estimated/proposed cut and fill quantities.
2. A Storm Water Pollution Prevention Plan will be required as the site is greater than an acre.
3. Show locations of roof downspouts. Stormwater from roof drains may not pass over ADA sidewalks per TSM 7-01.4.3E.
If you have any questions or concerns, please contact
Marco Contreras
Marco.contreras@tucsonaz.gov
Site Landscape REVIEW COMPLETED
Site Zoning REVIEW COMPLETED Clearly depict on the site plan the location and heights of the proposed shade structures. Additionally, provide setback information for each of the proposed structures.
Storm to Shade Review REVIEW COMPLETED Comments in studio session
TW New Development Review REVIEW COMPLETED Based on the information provided, Tucson Water has no objections to, or comments on, the proposed development.

If any new domestic water, irrigation water, or fire water services are needed to serve this proposed development, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov.

Also, any modifications to existing Tucson Water infrastructure shall not be performed until Tucson Water New Services or New Development has notified and consulted.

The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:
Richard A. Sarti, P.E.
(520) 400-4001
TW Planning and Engineering Review REVIEW COMPLETED Please see sheets 16,17, and 20 for redlines and comments. Provided the redlines are addressed, no resubmittal is required
Urban Forestry REVIEW COMPLETED 75% comments provided, can update at 90% or anytime
Water - PDSD REVIEW COMPLETED Provide the size of the water meter, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018.
Zoning Modifications - DDO REVIEW COMPLETED
Zoning Modifications - IPP REVIEW COMPLETED
Zoning Modifications - MS&R REVIEW COMPLETED