Plan Review Detail
Review Status: Requires Resubmit
Review Details: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Plan Number - CIP-0825-00021
Review Name: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| External Reviewers - Tucson Airport Authority | APPROVED | December 16, 2025 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: CIP-0825-00021, 1 st Submittal, Richard Ortiz Regional Complex (El Pueblo Center) / 101 W. Irvington Rd, Tucson, AZ. 85714, Received December 4, 2025 To whom this may concern, Thank you for the opportunity to comment on CIP-0825-00021, 1 st Submittal, a development plan for improvements within an existing public park at 101 W. Irvington Rd. This development is located in the N.E. quarter of the N.W. quarter of Section 1, Township 15S, Range 13E, of the Gila and Salt River Meridian. The development site occupies parcel number 137-07-2940, covers approximately 13.83 ± acres, and is zoned as Office 3 Zone (O-3) and Residence 2 Zone (R-2). The nearest major roadway intersection is South Nogales Highway and West Irvington Road, approximately 1,250 feet to the northeast of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the 1st submittal of this project and is not requiring a resubmittal of this project. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520- 573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning |
|||
| Neighborhood Traffic Mitigation | NOT REQUIRED | ||||
| TSMR/PDMR - Engineering | NOT REQUIRED | ||||
| TSMR/PDMR - Environmental Services | NOT REQUIRED | ||||
| Zoning Administration | NOT REQUIRED | ||||
| Zoning Compliance Review | NOT REQUIRED | ||||
| CDRC Post Review Express | REQUIRES RESUBMIT | Please address reviewers' comments for next submittal. If any of the following apply, a Fugitive Dust Activity Permit is required from the Pima County Department of Environmental Quality (PDEQ). Earthmoving or Land Clearing over 1 acre Trenching over 300 feet for utility installation or repair Road construction over 50 feet Blasting Please contact the following to obtain your permit. Fugitive Dust Activity Permit: Contact Pima County ADEQ at (520) 724-7400 https://www.pima.gov/596/Fugitive-Dust Once received you may upload your permit to the attachment section along with any external reviewer approval letters. If you have any questions regarding this information, please contact Sonya Bermudez at sonya.bermudez@tucsonaz.gov or 520-730-7979. |
|||
| External Reviewers - Tucson Electric Power (TEP) | REQUIRES RESUBMIT | 4350 E. Irvington Road Post Office Box 711, Tucson, AZ 85702 December 29, 2025 WO#T170978 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: El Pueblo Center CIP-0825-00021 Tucson Electric Power Company (TEP) has reviewed and cannot approve the development plan submitted 12/4/2025. There are existing facilities within the development which are depicted upon the plan. COMMENTS ONLY PLEASE INDICATE APPROVAL WITH THE BELOW CHECK BOX PLEASE DO NOT ADJUST IF THERE ARE NO COMMENTS Further: TEP Easements are not shown on Development plans. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Fred Quintero (520) 235-6329 fquintero@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
|||
| Site Engineering | REQUIRES RESUBMIT | Permit: CIP-0825-00021 Location: 101 W IRVINGTON RD Review Date: 12/8/2025 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering Comments: 1. The use of underground storage will be acceptable for this project on the condition that the Underground Storage Standards are met from section 4.13 of the Design Standards for Stormwater Detention and Retention Manual. Please include a letter in the next submittal addressing each single standard found in section 4.13 and how it is being met. It should be noted the Underground storage to achieve required retention is not permitted unless approval from floodplain administration is given, It will not require their approval if only detention is being achieved within the underground storage. The drainage report should also breakdown total retention/detention achieved and how much is achieved broken down to each component to ensure compliance with the underground storage. 2. Provide a retention/detention basin maintenance checklist and schedule in the Drainage report. 3. Provide a descriptor box adjacent to each basin on the site plan (Includes Stormwater Harvesting basins/landscaping). Include a leader arrow to the basin or provide a label for the basin and reference the label on the top of the descriptor box. Include the following applicable information in the descriptor box: a. Total volume, cubic feet or acre feet; b. If applicable, detention volume, cubic feet or acre feet; c. If applicable, retention volume, cubic feet; d. If applicable, first-flush retention volume, cubic feet; e. If applicable, Q100 in, cubic feet per second; f. If applicable, Q100 out, cubic feet per second; g. Basin top elevation, feet; h. 100-year water surface elevation, feet; and i. 100-year ponding depth, (measured from the lowest elevation of the basin), feet. DSSDR 11.1.3 If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
|||
| Bldg Permits - Post Review Express | REVIEW COMPLETED | ||||
| Building Official | REVIEW COMPLETED | ||||
| CDRC Application Completeness Express | REVIEW COMPLETED | CDRC added TAA, ADOT, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to TAA, ADOT, and TEP. FYI email sent to PAG, USPS, SWG. And Parks | |||
| Commercial Building | REVIEW COMPLETED | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. 1. Please provide the structural calculations used for the following items in the preparation of this project. IBC 107.2.7 A. Pickle ball fence, B. Shade and shade sail structures C. Light pole bases. 2. Provide complete construction drawings for the shade and shade sail structures. IBC 107.2 3. Provide engineering or the manufacturer’s installation instructions for the playground equipment. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
|||
| Commercial Electrical | REVIEW COMPLETED | Commercial Electrical Review CIP-0825-00021 (101 W IRVINGTON RD TUCSON, AZ 85714) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Provide a panel schedule for the new Splash Pad Control panel. Or reference the schematics on sheet SP-601 from sheet E3.0. 2. The equipment Room Plan on sheet SP-121 does not match the ‘Existing Equipment Room Electrical Plan’ shown on sheet E1.1. Provide consistent information and equipment locations. 3. Show or Note that all applicable electrical work shall comply with, Corrosive Environment – NEC 680.7, 680.14. REF Sheet E1.1, Electrical Plan – Splash Pad Equipment Room. 4. Provide Equipotential Bonding per 680.26. the splashpad shell, reinforcing steel, perimeter surfaces, metallic components, fixed metal parts, etc., shall be bonded per 680.26. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
|||
| Commercial Mechanical | REVIEW COMPLETED | ||||
| Commercial Plumbing | REVIEW COMPLETED | ||||
| Entitlements | REVIEW COMPLETED | ||||
| External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | Re: TDC External Review PERMIT: CIP-0825-00021 Please Sign-In DUE: 12/16/2025 jgomes@azdot.gov on behalf of ADOT SC Traffic Engineering - ADOT CDRC Good Morning, ADOT has no comments on this CIP. Thank you for the opportunity to review. |
|||
| External Reviewers - COT Parks & Recreation | REVIEW COMPLETED | Approved TPRD TPRD-ExternalReview CDRC Elliot Welch CDRC, Approved Regarding CIP-0825-00021, The City of Tucson Parks and Recreation Department has no additional requirements for the Project and no further reviews by TPRD are required. Description: El Pueblo Center Address: 101 W IRVINGTON RD TUCSON AZ 85714 Parcel: 13707047A Regards, Joe Barr Project Manager Tucson Parks and Recreation 520-307-2811 |
|||
| External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | |||
| External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | |||
| External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | |||
| Fire New Construction | REVIEW COMPLETED | No comments | |||
| New Services/JOC | REVIEW COMPLETED | Based on the information provided, Tucson Water has no objections to, or comments on, the proposed development. If any new domestic water, irrigation water, or fire water services are needed to serve this proposed development, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov. Also, any modifications to existing Tucson Water infrastructure shall not be performed until Tucson Water New Services or New Development has notified and consulted. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. | |||
| NPPO | REVIEW COMPLETED | ||||
| Outdoor Lighting | REVIEW COMPLETED | Outdoor Lighting Review CIP-0825-00021 (101 W IRVINGTON RD TUCSON, AZ 85714) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf 1. Show lamps with a maximum of 3500K color temperature, OLC 402.1. Lighting fixtures PN2 and PN3 do not indicate the color temperature. 2. Provide Outdoor Lighting Special Inspection Certificate. Special inspection is required for Recreation Facility Installations. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf 3. Specify any exceptions used. OLC 104.2.3, exception. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
|||
| PDSD Application Completeness Express | REVIEW COMPLETED | ||||
| ROW Engineering Review | REVIEW COMPLETED | Sidewalk required along street frontage on Missiondale Rd, ADA ramps should be placed at Driveway or reconstruct per PAG SD 206 | |||
| Signs | REVIEW COMPLETED | All signage must be submitted as a separate sign application | |||
| Site Landscape | REVIEW COMPLETED | ||||
| Site Zoning | REVIEW COMPLETED | ||||
| Traffic Engineering Review | REVIEW COMPLETED | No traffic comments | |||
| TSMR/PDMR - Landscape | REVIEW COMPLETED | ||||
| TW Planning and Engineering Review | REVIEW COMPLETED | Previous comments have been addressed. No new comments at this time. | |||
| Water - PDSD | REVIEW COMPLETED | ||||
| Zoning Modifications - IPP | REVIEW COMPLETED | ||||
| Zoning Modifications - Variance | REVIEW COMPLETED |