Plan Review Detail
Review Status: Requires Resubmit
Review Details: CIP - DEVELOPMENT SITE - FINAL v.1
Plan Number - CIP-0824-00027
Review Name: CIP - DEVELOPMENT SITE - FINAL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Real Estate | NOT REQUIRED | Plese contact the Rea Estate Division if any property rights need to be addressed. | |||
| CDRC Post Review Express | REQUIRES RESUBMIT | Please address reviewers comments then resubmit. Once all have been approved we will then ask you to apply using your TDC Account. | |||
| ROW Engineering Review | REQUIRES RESUBMIT | Review prior ROW Comments from Jesus V - S Forgeus Ave or onsite parking does does not have proper turnaround for public services, a cul-de-sac with 40' radius should be designed. Public Access Easement or dedicate as public ROW required. Ingress/egress easement is needed for 2945 S Forges Ave. Access ramp for multi use pathways required. Ramp width should be the width of the MUP or 8' min. ADA required spacing may is not being met See DTM comment file in attachments.. Provided Comments Response letter for above requested items for completion of Review. |
|||
| CDRC Application Completeness Express | REVIEW COMPLETED | ||||
| Commercial Plumbing | REVIEW COMPLETED | ||||
| Entitlements | REVIEW COMPLETED | ||||
| External Reviewers - Tucson Airport Authority | REVIEW COMPLETED | February 8, 2026 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: CIP-0824-00027, 2 nd Submittal, James Thomas Walkway and Turf Reduction Project, 3200 S. Forgeus Ave., Tucson AZ 85713, Received January 26, 2026 To whom this may concern, Thank you for the opportunity to comment on CIP-0824-00027, 2 nd Submittal, a development plan for new park improvements at 3200 South Forgeus Avenue. This development is located in the S.W of the quarter of the N.E. quarter of Section 29, Township 14S, Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel number 132-08-007E, covers approximately 9.07 ± acres, and is zoned as Residence 1 Zone (R-1). The nearest major roadway intersection is East Pinal Vista and South Forgeus Avenue, approximately 500 feet to the southeast of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the 2 nd submittal of this project and is not requiring a resubmittal of this project. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520- 573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning cc file |
|||
| External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | 4350 E. Irvington Road Post Office Box 711, Tucson, AZ 85702 February 17, 2026 WO#T160455 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: ADA and connectivity issues with a new walking path CIP-0824-00027 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 1/26/2026. There are existing facilities within the development which are not depicted upon the plan. No apparent conflicts from existing service to bathrooms. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Martin Salazar (520) 305-6713 msalazar@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
|||
| Fire New Construction | REVIEW COMPLETED | No comments | |||
| New Services/JOC | REVIEW COMPLETED | CIP-0824-00027 (3200 S FORGEUS AV TUCSON, AZ 85713) New walking path around the park (James Thomas Park) Based on the information provided, Tucson Water has no objections to, or comments on, the proposed development. If any new domestic water, irrigation water, or fire water services are needed to serve this proposed development, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal | |||
| NPPO | REVIEW COMPLETED | ||||
| Signs | REVIEW COMPLETED | ||||
| Site Engineering | REVIEW COMPLETED | 1. Include the cut/fill quantities on the plans. 2. Include Pima County in the review for loop connection. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
|||
| Site Landscape | REVIEW COMPLETED | ||||
| Site Zoning | REVIEW COMPLETED | ||||
| Traffic Engineering Review | REVIEW COMPLETED | Matt Traffic Engineering does not have any comments on this project. I reviewed the “James Thomas Park Pathway 100_v1” document uploaded into Energov on 1-26-26. This project has not appeared in my Energov queue to approve. thanks Hal Feldman, P.E. Dept. of Transportation & Mobility City of Tucson Hal.Feldman@tucsonaz.gov |
|||
| TW Planning and Engineering Review | REVIEW COMPLETED | Previous comments have been addressed. If any questions arise during construction please email them to michael.asbury@tucsonaz.gov | |||
| Water - PDSD | REVIEW COMPLETED |