Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: CIP-0624-00020
Parcel: 30503004B

Review Status: Requires Resubmit

Review Details: CIP - COMMERCIAL STRUCTURE - FINAL v.1

Plan Number - CIP-0624-00020
Review Name: CIP - COMMERCIAL STRUCTURE - FINAL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Bldg Permits - Post Review REQUIRES RESUBMIT ACTIVITY NO. CIP-0624-00020
ADDRESS/PARCEL: 10001 S WILMOT RD

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson THE International Building Code (IBC), and all permitting regulations within the City of Tucson

REVIEW COMMENTS:
1. Please upload a comment response letter for Building Safety that clearly demonstrates that the comments were addressed.
2. Address the comments from Building Safety on: Commercial Plumbing, Mechanical, and Building reviewers.
3. Initialize a utility permit upon the submittal of your Final Development Package if necessary.
4. Submit your special inspections certificate for review with your final Building Permit.
5. Ensure that you have your Pima County Wastewater permit, or Sewer Release letter prior to submittal of your Final Building Permit. City of Tucson *will not* release any permits without either of these.
6. Ensure that the Project Manager understands all conditions placed on the permit and that in some cases construction cannot commence prior to these being completed – although in this case the site has already been built.


If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov
Commercial Building REQUIRES RESUBMIT The previous comments were not responded to. Please allow me to copy and paste the previous comment below, please resolve the listed items:
ACTIVITY NO. CIP-0624-00020 ADDRESS/PARCEL: (10001 S WILMOT RD TUCSON, AZ 85756) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: 1. In the Project Information, Occupancy Type row indicates 58 occupants. However, in the Occupancy Calculation it indicates 56 occupants. Please be consistent with the occupant load. 2. An exit access shall not pass through a room that can be locked to prevent egress. IBC 1016.2 Please ensure this is complied to on the door between the new training space and student registration room. 3. Please add a separate line for the occupant load calculation for the Student Registration room. This should be a separate line from the New Training Space occupant load line. 4. Direction of swing. a. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. IBC 1010.1.2.1 Please comply to this code section for the outer door for the Student Registration. 5. Show the clearance within the restroom such as the water closet floor clearance, as well as the turning radius. 6. Miscellaneous: a. Will the class need a projector, if so provide electrical for it. b. Will there be a need for a p.a. system, if so provide power for it. c. Is there a blackboard, if so please show it on your drawings. d. Will there be a lectern for the instructor, if so provide electrical on the floor. 7. Please locate/label the location of the bicycle rack on the Site Plan. 8. Please resubmit.
Commercial Mechanical REQUIRES RESUBMIT If the excess outside air is to be relieved by a barometric relief damper on the AC unit, verify that the relief outlet is located to avoid recirculation of the relieved air into the building. Reference: Section C403.5.3.4, IECC 2018. [Initial comment: Approximately 600 CFM of outside air is being delivered to the training classroom. With the only exhaust being taken from the custodial closet, how is the room pressure being controlled? Reference: Section 403.1, IMC 2018.]
Commercial Plumbing REQUIRES RESUBMIT The specified water fountain does not include a bottle filler. A permanent cup dispenser is not specified or shown on the plans and its location is not identified. [Initial comment: Provide the number of drinking fountains that complies with the requirements of Sections 2902.1 and 2902.5, IBC 2018 and Section 410.3, IPC 2018.]
PDSD Application Completeness REVIEW COMPLETED