Plan Number: CIP-0624-00019
Parcel: 122170710

Review Status: Approved

Review Details: CIP - DEVELOPMENT SITE - FINAL v.1

Plan Number - CIP-0624-00019
Review Name: CIP - DEVELOPMENT SITE - FINAL v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Historic APPROVED
NPPO APPROVED
Site Engineering APPROVED
Site Landscape APPROVED
Site Zoning APPROVED
Traffic Engineering Review APPROVED Traffic Engineering has no comments on this development
TW Planning and Engineering Review APPROVED Thank you for adding the water lines to the utility plan. No further comments.
Entitlements NOT REQUIRED
External Reviewers - Southwest Gas NOT REQUIRED
Real Estate NOT REQUIRED Please contact the Real Estate Division if any property rights need to be addressed.
Archeological Sensitivity - Standard REVIEW COMPLETED Per the archaeological review and Request for Consultation with SHPO dated Janary 28, 2025, "The area of potential effects (APE) includes the project footprint and all immediately adjacent properties. Although no cultural resources surveys have been performed with the APE, based on AZSITE, cultural resources surveys completed within a half mile radius of the APE resulted in the discovery of no archaeological sites. The closest sites are over a mile or more away and those represent historic buildings that were assigned site numbers, a practice that has since been discontinued. The probability of subsurface deposits is low based on the results of previous inventories surrounding the APE, a high degree of disturbance related to suburban residential development, and the APE’s location away from landforms commonly associated with higher densities of precontact Native American occupations...Based upon the information above, the City has determined that a finding of “No Adverse Effect to Historic Properties” is appropriate for this project." SHPO concurred on February 25, 2025.
CDRC Application Completeness Express REVIEW COMPLETED
CDRC Post Review Express REVIEW COMPLETED Please submit all documentation, supporting external review approval letters, required permits, waivers, and reports to your DP application using your TDC online applicant account. Once submitted please reach out to CDRC@tucsonaz.gov so we can process the DP.
Commercial Plumbing REVIEW COMPLETED
External Reviewers - Pima County Addressing REVIEW COMPLETED Good afternoon,



Pima County Addressing approves CIP-0624-00019.



Nicholas Jordan

Site Review Project Manager II – Addressing Official

Pima County Development Services Department

201 N Stone AV – 1st Floor

Tucson, AZ 85701

(520) 724-9623
External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED February 7, 2025
WO#T136537
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Willard St Apartments Phase II
CIP-0624-00019
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 12/13/2024. There are no apparent conflicts at this time with the existing
pole line on Willard. Possible relocation of overhead services required.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Salazar
(520) 305-6713
msalazar@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
Fire New Construction REVIEW COMPLETED
New Services/JOC REVIEW COMPLETED CIP-0624-00019 - CIP - Development Site - Final v1 - 3429 E WILLARD

The New Development Section has no developer financed projects in this area that may affect or be affected by this Capital Improvement Project.

No further reviews by Tucson Water’s New Development Section is required, as no construction of new public water mains, or relocation of existing public water mains is proposed as part of this project.

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
ROW Engineering Review REVIEW COMPLETED No proposed improvements in the ROW.
Signs REVIEW COMPLETED
Water - PDSD REVIEW COMPLETED