Plan Number: CIP-0525-00012
Parcel: 10712271B

Review Status: Approved

Review Details: CIP - DEVELOPMENT SITE - FINAL v.1

Plan Number - CIP-0525-00012
Review Name: CIP - DEVELOPMENT SITE - FINAL v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Traffic Engineering Review APPROVED Traffic Engineering has no comments on this Parks improvement project.
NPPO NOT REQUIRED
Real Estate NOT REQUIRED Any proposed improvements being constructed outside property lines and into public rights-of-way require a right-of-way permit and Private Improvement Agreement with the Department of Transportation & Mobility or Temporary Revocable Easement with the Real Estate Division (separate processes). If any action is required to address property rights (dedications, easements, etc), please contact the Real Estate Division 520-791-4181.
CDRC Application Completeness Express REVIEW COMPLETED CDRC added Parks, ADOT, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to Parks , ADOT, and TEP. FYI email sent to PAG, USPS, SWG.
CDRC Post Review Express REVIEW COMPLETED Please submit all documentation supporting external review approvals, required permits, and reports to your DP application using your TDC online applicant account
Commercial Plumbing REVIEW COMPLETED
Entitlements REVIEW COMPLETED
External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED Good Afternoon,

ADOT has reviewed this CIP and has no comments.

Thank you for the opportunity to review.
External Reviewers - COT Parks & Recreation REVIEW COMPLETED CDRC,



Approved



Regarding CIP-0525-00012, The City of Tucson Parks and Recreation Department has no additional requirements for the Project and no further reviews by TPRD are required.



Description: Prop 407 improvements to Keeling Neighborhood Park including new solar light, adjustments to entry monument walls, interior structures and perimeter walls, remove playground, install informal basketball court, add cement animals, and improve irrigation and plantings.



Parcel: 10712271B



Regards,



Joe Barr

Project Manager

Tucson Parks and Recreation
External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED September 23, 2025
WO#T161453
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Residential Model Plan
CIP-0525-00012
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 8/27/2025. There are no existing facilities within the development. There
are no apparent conflicts at this time.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Chuck Leon
(520) 400-6133
cleon@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
Fire New Construction REVIEW COMPLETED No comments
New Services/JOC REVIEW COMPLETED Tucson Water New Area Development has no objections to or comments on this project.
ROW Engineering Review REVIEW COMPLETED No ROW improvements required
Signs REVIEW COMPLETED
Site Engineering REVIEW COMPLETED
Site Landscape REVIEW COMPLETED
Site Zoning REVIEW COMPLETED
TW Planning and Engineering Review REVIEW COMPLETED There are no comments at this time. There is no observable impact on the existing potable water distribution main on the plan sets provided.
Water - PDSD REVIEW COMPLETED