Plan Number: CIP-0525-00007
Parcel: 141020250

Address:
9900 E DREXEL RD

Review Status: Approved

Review Details: CIP - DEV SITE + COMM STRUCTURE - INITIAL v.1

Plan Number - CIP-0525-00007
Review Name: CIP - DEV SITE + COMM STRUCTURE - INITIAL v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Bldg Permits - Post Review Express REVIEW COMPLETED
CDRC Post Review Express REVIEW COMPLETED Before we are able to issue your permit, a Pima County ADEQ Permit is required.

Fugitive Dust Activity Permit: Contact Pima County ADEQ at (520) 724-7400

 https://www.pima.gov/596/Fugitive-Dust
Entitlements REVIEW COMPLETED Conforms to PAD-30
External Reviewers - COT Parks & Recreation REVIEW COMPLETED CDRC,



Approved



Regarding CIP-0525-00007, the City of Tucson Parks and Recreation Department has no additional requirements for the Development Plan and no further reviews by TPRD are required.



Description: Excavation of reclaimed water recharge basin with new piping connection and electrical instrumentation.



Address: 9900 E DREXEL RD, TUCSON, AZ, 85747



Regards,



Joe Barr

Project Manager

Tucson Parks and Recreation
External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED May 23, 2025
WO#T151437
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Residential Model Plan TXT
CIP-0525-00007
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 5/16/2025. There are no existing facilities within the development. There
are no apparent conflicts at this time.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Rodriguez
(520) 991-5495
mrodriguez@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
New Services/JOC REVIEW COMPLETED CIP-0525-00007 - CIP - Dev Site - + Comm Structure - Initial v1 - 9900 E DREXEL RD

The New Development Section has no developer financed projects in this area that may affect or be affected by this Capital Improvement Project.

No further reviews by Tucson Water’s New Development Section is required.


Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
NPPO REVIEW COMPLETED
Outdoor Lighting REVIEW COMPLETED Outdoor Lighting Review CIP-0525-00007 (9900 E DREXEL RD TUCSON, AZ 85747)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).

Outdoor Lighting Review:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

1. Provide an outdoor lighting plan that meets the requirements of OLC 104.2. Show/locate the different light sources on your site plan. Number the light fixtures on your table and use the same number on your site plan.
2. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 3.1.2. Include all exterior fixtures on the property in the calculations. Show unshielded fixtures with a maximum of 3,000 lumens, OLC 401.4. Show lamps with a maximum of 3500K color temperature, OLC 402.1. Fixtures installed under canopies and overhangs. Outdoor lighting fixtures shall not be counted in determining the total light output when they are full cutoff light fixtures installed under canopies, building overhangs, or roof eaves, OLC 401.2.1(3).
3. Show compliance with total outdoor light output per 2012 City of Tucson/Pima County Outdoor Lighting Code section 401.2. Total outdoor light output shall not exceed the lumen limits listed in Table 401.1. 4. E1.1 – Lighting Code section 104.2.2.
4. Submit catalogue or specification sheets of all proposed new outdoor lighting fixtures illustrating the type of fixture, color temperature, lumens rating and whether full cut-off or unshielded.

5. Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2.

6. Specify any exceptions used.

7. Provide Curfew lighting controls If applicable Per section 403.


Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
Site Engineering REVIEW COMPLETED 1. Please include the cut/fill quantities on the plans.
2. Please include a copy of the referenced geotechnical report in the next submittal and include the contact information of the geotechnical firm on the cover sheet of the plans.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
Site Landscape REVIEW COMPLETED
Site Zoning REVIEW COMPLETED CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Loran Shamis
PDSD Zoning Review Section

PROJECT: Southeast Houghton Area Recharge Project
Capital Improvements Project (CIP) - Initial
CIP-0525-00007

TRANSMITTAL DATE: May 27, 2025
DUE DATE: May 16, 2025

1. COMMENT: 2-06.3.1 – Ensure each sheet is 24” by 36”

2. COMMENT: 2-06.4.2.B – Include the following brief legal description in the title block: SAGUARO TRAILS SQ20172860622 BLOCK 8

3. COMMENT: 2-06.4.3 - Provide the development package case number, CIP-0525-00007, and the previously approved rezoning case number, C9-16-09, adjacent to the title block on each sheet.

4. COMMENT: 2-06.4.4 – Ensure the project location map in the upper right corner of the cover page is drawn at a scale of three inches equal to one mile.

5. COMMENT: 2-06.4.6 – Include a map separate from the project-location map, reduced-scale map of the Planned Area Development (PAD) zone on the first sheet.

6. COMMENT: 2-06.4.7.A.1 – Include a general note on Sheet 19 stating the Existing Zoning is PAD-30

7. COMMENT: 2-06.4.7.A.4 – Update the note stating the existing and proposed use is Utilities – Distribution Systems on Sheet 19.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations


If you have any questions about this transmittal, Contact Loran Shamis by email Loran.Shamis@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
Storm to Shade Review REVIEW COMPLETED Comments added to attachments folder
TW Planning and Engineering Review REVIEW COMPLETED TW has no comments for this project review
Water - PDSD REVIEW COMPLETED