Plan Review Detail
Review Status: Requires Resubmit
Review Details: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Plan Number - CIP-0525-00007
Review Name: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| CDRC Post Review Express | APPROVED | DP will be ready for submittal. Spoke to Matt for resubmittal for the Building side. Spoke with Tariq and gave further instructions. Please reach out to me if you have any questions please reach out. Please apply through your applicat TDC Account | |||
| Site Engineering | APPROVED | ||||
| Signs | NOT REQUIRED | ||||
| Zoning Administration | NOT REQUIRED | ||||
| Zoning Compliance Review | NOT REQUIRED | ||||
| Bldg Permits - Post Review Express | REQUIRES RESUBMIT | CIP will allow the DP to be applied for, but there are numerous comments that need addressing for Building Safety. Please resubmit all Building Safety Construction documents for final review through the CIP portal. |
|||
| Building Official | REVIEW COMPLETED | Not Required/ | |||
| CDRC Application Completeness Express | REVIEW COMPLETED | ||||
| Commercial Building | REVIEW COMPLETED | 1. Submit the shop drawings for the steel stair and railing. 2. Submit the structural calculation and detail drawings for the camera pole. 3. Submit the structural calculation and detail drawings for the Bench Ramada. Ensure bench comply to the ICC A117.1 for accessibility. 4. In your Cover Sheet/Front Page, please list the special inspections required for this project IBC 107.2.1 For example, Post installed anchors. 5. Please provide a special inspection certificate with Part A, and Part B completed with next submittal. This form is available in https://www.tucsonaz.gov/files/sharedassets/public/city-services/planning-development-services/documents/special_inspection_certificate.pdf Ensure that Part B is sealed/signed/dated by the special inspector in charge. Ensure to use Special Inspectors who are active in the approved list of special inspectors. They are available in the following links: special-inspectors-by-name.pdf (orovalleyaz.gov) https://content.civicplus.com/api/assets/e426f390-7bd6-4c47-9bc1-357282083afd https://www.phoenix.gov/pddsite/Documents/TRT/dsd_trt_pdf_00870.pdf |
|||
| Commercial Electrical | REVIEW COMPLETED | no comments. | |||
| NPPO | REVIEW COMPLETED | ||||
| Outdoor Lighting | REVIEW COMPLETED | no comments. | |||
| PDSD Application Completeness Express | REVIEW COMPLETED | ||||
| Site Landscape | REVIEW COMPLETED | ||||
| Site Zoning | REVIEW COMPLETED |