Plan Review Detail
Review Status: Approved
Review Details: CIP - COMMERCIAL STRUCTURE - INITIAL v.1
Plan Number - CIP-0424-00016
Review Name: CIP - COMMERCIAL STRUCTURE - INITIAL v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Building Official | NOT REQUIRED | ||||
| Signs | NOT REQUIRED | Interior work to a kitchen within a Fire Station - sign review not required | |||
| Site Landscape | NOT REQUIRED | ||||
| Storm to Shade Review | NOT REQUIRED | S2S Review not required | |||
| TW Planning and Engineering Review | NOT REQUIRED | ||||
| Zoning Administration | NOT REQUIRED | ||||
| Zoning Compliance Review | NOT REQUIRED | ||||
| Zoning Modifications - DDO | NOT REQUIRED | ||||
| Zoning Modifications - IPP | NOT REQUIRED | ||||
| Zoning Modifications - MS&R | NOT REQUIRED | ||||
| Zoning Modifications - Variance | NOT REQUIRED | ||||
| Bldg Permits - Post Review Express | REVIEW COMPLETED | ||||
| Commercial Building | REVIEW COMPLETED | The Architectural drawings does not have mounting details for the hood. Further the Mechanical Engineer has the following note, "for hood support see structural drawing". Please provide the structural drawing and calculation for this hood. | |||
| Commercial Electrical | REVIEW COMPLETED | The plans were not entered into the BlueBeam files for review. | |||
| Commercial Mechanical | REVIEW COMPLETED | ||||
| Commercial Plumbing | REVIEW COMPLETED | 1. Clarify the design of the gas piping. The Gas Diagram shows the existing unit heater with a load of 120 MBH while the Gas Meter Load chart shows the unit heater with a 75 MBH load. 2. Complete the Gas Diagram by inserting the Total Load and the Total Developed Length. |
|||
| Fire New Construction | REVIEW COMPLETED | -Separate permit and submittal required for new hood suppression system. It will be a deferred submittal through TFD. john.vincent@tucsonaz.gov 5203495581 |
|||
| Historic | REVIEW COMPLETED | Property is not historically designated nor is it located within a historic district or archaeological sensitivity zone. A determination of eligibility has not been made on this building. The proposed work with a limited scope does not appear to have an adverse impact on the building. If the SOW changes or proposed elements are relocated, Historic will need to review again. Questions? Jodie.Brown@tucsonaz.gov | |||
| ROW Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
|||
| Site Engineering | REVIEW COMPLETED | ||||
| Site Zoning | REVIEW COMPLETED | Interior Tenant Improvement. Zoning has no objections. Any expansions or additions to the building, and/or site will have to be reflected in a Development Package. | |||
| Traffic Engineering Review | REVIEW COMPLETED | No comments. Proposed work is outside the purview of DTM Traffic Engineering division. | |||
| Water - PDSD | REVIEW COMPLETED |